Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 14, 2025 at 8:00 PM
Updated October 1, 2024
Renovation and addition to a mixed-use development in Pittsford, New York. Completed plans call for the renovation of a educational facility; and for the addition of a educational facility.
2023 Central School District Capital Improvement Project - Phase 2 - Contract 205: Site Contract Separate Bids are requested for the following Prime Contracts: - Contract 205: Site Contract This project that focuses on ALL schools, but the majority of the work is at Barker Road Middle School (Renovations) and Mendon High School (Addition and Renovations) Mendon High School SED Control No.: 26-14-01-06-0-009-028 Sutherland High School SED Control No.: 26-14-01-06-0-003-030 Barker Road Middle School SED Control No.: 26-14-01-06-0-007-022 Calkins Road Middle School SED Control No.: 26-14-01-06-0-025-005 Allen Creek Elementary School SED Control No.: 26-14-01-06-0-004-023 Jefferson Road Elementary School SED Control No.: 26-14-01-06-0-002-025 Mendon Center Elementary School SED Control No.: 26-14-01-06-0-005-023 Park Road Elementary School SED Control No.: 26-14-01-06-0-006-022 Thornell Road Elementary School SED Control No.: 26-14-01-06-0-008-018 Lomb Administration Building SED Control No.: 26-14-01-06-1-001-007 Transportation Maintenance Facility SED Control No.: 26-14-01-06-5-011-072 Mendon HS Stadium Toilet Rooms SED Control No.: 26-14-01-06-7-041-001 Question Deadline 02/20/2025 Question to Construction Manager Campus Construction Management Group Attn: Nick Ippolito 1241 Pittsford Victor Road Pittsford, NY 14534 Phone: 585-545-6567 Email: nippolito@campuscmg.com Pittsford CSD 2023 Capital Improvement Project - Phase 2 a. Mendon High School Addition, Renovations, and Site Work b. Barker Road Middle School Renovations and Site Work c. Sutherland High School Renovations and Site Work d. Calkins Road Middle School Renovations e. Allen Creek Elementary School Renovations f. Jefferson Road Elementary School Renovations g. Mendon Center Elementary School Renovations h. Park Road Elementary School Renovations i. Thornell Road Elementary School Renovations j. Transportation & Maintenance Facility Renovations k. Lomb Administration Building Renovations l. Mendon HS Stadium Toilet Room Building a. All Site Work bidders shall visit the site to verify and review existing conditions before estimating the cost of the project. In addition, they shall thoroughly review all geo-technical information on the site. b. GENERAL CLARIFICATION: The Site Contractor is responsible for specific site work for this project as detailed below: 1. Sutherland High School Temporary Access Road 2. Sutherland High School New Tennis Courts/ ADA Path 3. Sutherland High School Old Tennis Courts to Pickleball Courts Conversion 4. Sutherland High School Baseball Field Drainage 5. Sutherland High School Softball Field Drainage 6. Mendon High School Tennis Courts 7. Mendon High School Baseball Field Drainage 8. Barker Road Middle School District Office Parking Lot (off District Office Entrance) 9. Barker Road Middle School D-Zone/ ADA Path c. The Site Work Contractor is responsible to provide all required closeout documentation including reports of legal disposal of all debris removed off site. Site Work Contractor shall provide the District and Architect with a written agreement and stipulated legal compliance to properly dispose of material off site. d. The Site Work Contractor is responsible for offsite disposal of unsuitable spoil resulting from the excavation work. e. Review Section 011215 for Project Schedule for work of this contract. f. Review Section 012100 for Allowances for work of this contract. g. Review Section 012200 for Unit Pricing for work of this contract. h. Review Section 012300 for Alternates for work of this contract. i. Review Section 015000 for Temporary Construction for work of this contract. j. The Site Work Contract includes all site demolition such as utilities, paving, fencing, trees, shrubs, landscaping, etc....and offsite legal disposal, including its own dumpsters and the protection and maintenance of all existing utilities throughout construction, including those to be relocated or replaced. k. Site Utility Installation is the responsibility of site contractor and starts 5' outside of each building. The Site Work Contractor shall coordinate final connections with the Plumbing Contractor. Where utilities run parallel to the building on the exterior it is the intent that the Site Work Contractor will take these utilities from the other prime contractors at the point where the utility exits the building and complete the installation and shall make connections from where other primes stopped at 5 feet outside building. The Site Contractor shall employ the professional services of an acceptable utility locator to find all underground district utilities and public utilities and mark the site accordingly and identify on as built documents. l. The Site Work Contractor is responsible for offsite disposal of unsuitable spoil resulting from the excavation work. m. The Site Work Contractor is responsible for all site demolition, fence work, paving and concrete work. n. All Contractors are responsible for dewatering for the work of their Contract. o. Where shown on the Contract Drawings, this contract will relocate existing plantings to temporary locations and relocate again to final location. Maintenance and care is the responsibility of this contract. It will be the responsibility of this Contract to replace plantings that die or become discolored/damaged with healthy plants of the same kind and size. p. Dust control and SWPPP installation measures along with maintenance is the responsibility of the Site Work Contractor throughout the duration of the construction project including the supply of water used for dust control. q. Roads, temporary and permanent, need to be cleaned and maintained on a continuous basis. Keep roads clean of mud and debris for work of this contract. This includes but is not limited to scraping, sweeping, and washing. No materials to be tracked off site. If materials are tracked off site, it shall be cleaned up immediately. r. Wherever construction activities take place that are the responsibility of this prime contract, the Site Work Contractor is to provide six-foot post driven temporary construction fencing for the duration of the entire project, separating the construction site from all other areas of activity (i.e. residential neighborhood, school activities, existing sidewalks, roadways, buildings, staging areas, fencing around construction areas etc. Reference the Site Safety and Logistics Plans for each building site for temporary construction/safety fencing layout. s. The Site Work Contractor is responsible for preparing the site as shown on the Site Safety and Logistics Plans at each building site pertaining to Site Work. This includes installation of, maintenance of, and removal/restoration at the end of the project of all fencing, temporary walkways, roadways, roadway barriers, pavement markings, staging areas, access roads, temporary trailer areas etc. associated with their contract work. t. All Contractors shall provide any and all temporary shoring, bracing, support, or protection systems necessary to expedite their work requirements, including the maintenance of workers safety and compliance with OSHA safety regulations. u. All Prime Contractors are required to clean their own work area at the end of each workday. v. All Site Furnishings such as planting urns, benches, tree grates, etc. are the responsibility of Site Work Contractor. w. The Site Work Contractor is responsible to provide all trees, shrubs, ground cover, mulch and all other landscape plantings for all areas outside and as indicated on the contract drawings. x. All Traffic Control Devices are the responsibility of the Site Work Contractor. y. All yard hydrants and connection of are the responsibility of the Site Work Contractor. z. At all fencing located in pavement the contractor shall install fence posts and foundations prior to installation of the top course of paving. aa. The Site Work Contractor is required to engage a land surveyor registered and licensed in the state of New York to establish and maintain sufficient property, benchmarks, and easement lines locations as well as locations, elevations and grades for construction of all site work components required for the work of this contract. All information is to be clearly marked for identification and use by other trades. bb. All permitting required for curb cuts on public streets or rights of way is the cc. responsibility of the Site Work Contractor including any fees or additional bonding required by the permit agency. dd. Site Work Contractor shall provide locating services to locate all private and public utilities prior to excavation for the scope of its work. ee. The Site Contractor shall maintain traffic and is solely responsible for safety throughout the length and duration of their work at work sites identified in "b" above. Coordinate with Construction Manager and Owner for locations of signs, cones, and flag-persons as necessary to maintain proper traffic control for the duration of this project. The Site Contractor is required to implement the use of temporary traffic control signals if necessary. ff. The Site Contractor shall maintain at least one lane of traffic open. The minimum width shall be 12'. gg. All mud removal, snow removal, plowing, salting as necessary to ensure a safe and unhindered work site is the responsibility of the Site Contractor, unless noted otherwise. The Site Contractor is responsible for all snow removal and maintenance at / for any site work not substantially complete, including but limited to: sidewalks, parking areas, and access roads as identified in "b" above.
Post-Bid
Educational
$4,500,000.00
Public - City
Addition, Renovation
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 13 - Special Construction
Division 14 - Conveying Equipment
Division 21 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 41 - Material Processing and Handling Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 5, 2025
May 1, 2025

Multiple Locations, Pittsford, NY
Related To This Project
Pittsford, NY
Bid Date: Mar 05 2025
Pittsford, NY
Bid Date: Mar 05 2025
Pittsford, NY
Bid Date: Mar 05 2025
Pittsford, NY
Bid Date: Mar 05 2025
Pittsford, NY
Bid Date: Mar 05 2025
Pittsford, NY
Bid Date: Feb 27 2025
Pittsford, NY
Bid Date: Mar 05 2025
Pittsford, NY
Bid Date: Oct 09 2024
Pittsford, NY
--
Pittsford, NY
Bid Date: Jun 12 2024
Pittsford, NY
Bid Date: May 15 2024
Pittsford, NY
--
Pittsford, NY
Bid Date: Jan 31 2024
Pittsford, NY
Bid Date: Jan 31 2024
Pittsford, NY
Bid Date: Jan 31 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
Pittsford CSD 2023 CIP - Phase 2 - Contract 205: Site Contract
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.