BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 26, 2026 at 7:00 PM

Updated February 27, 2026

Site work and environmental remediation for a development in Attleboro, Massachusetts. Completed plans call for site work for a development; and for environmental remediation for a development.

The work involves environmental remediation services at the Walton and Lonsbury Superfund Site, a former electroplating facility that operated from 1940 to 2007. Previous activities at the site have included demolition of facility buildings, removal of residual waste, excavation and disposal of contaminated media, and installation of an engineered cover behind residences along Paulette Lane and North Avenue to prevent chromium-contaminated groundwater from surfacing and to eliminate direct exposure to contaminated soil. Additionally, a permeable reactive barrier (PRB) was constructed at the downgradient edge of the cover to treat groundwater using zerovalent iron (ZVI), reducing hexavalent chromium (Cr[VI]) to the less toxic trivalent chromium before discharge into Bliss Brook southeast of the property. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Conservation and Development

$10,000,000.00

Public - Federal

Environmental Remediation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
4
Bidding Soon
2,200
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2026

April 21, 2026

Project location map

78 North Ave, Attleboro, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.