Site work and paving for a mixed-use development in Palm Springs, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.
**As of April 24, 2025 this project has not yet been awarded. A timeline for award has not yet been established. The Work comprises reconstruction and overlay of approximately 1.69 million square feet, in various locations throughout the City of Palm Springs including: recording, preservation and resetting of existing and new survey monuments; pulverization of existing asphalt concrete (AC) pavement; full depth milling of existing asphalt concrete pavement; 2-inch grind and overlays, full AC grind and overlay, unclassified excavation (export); preparation of subgrade; asphalt concrete paving; adjustment of utility manholes, vaults, and water valves to grade; removal and replacement or installation of concrete curb ramps and select gutters; construction of concrete cross gutters; traffic striping and markings; and all other appurtenant work. The work shall be diligently prosecuted to completion before the expiration of 60 Working days. The engineer's estimate is $6,000,000. Each bid shall be accompanied by an electronic copy to demonstrate proof of a certified or cashier's check or a Bid Bond in the amount of 10 percent (10%) of the total bid price, payable to the City of Palm Springs. The original will be collected from the apparent lowest responsive bidder and shall match the electronic copy. All questions about the meaning or intent of the Bid Documents are to be submitted in writing on the Questions tab within online. Questions submitted after 12:00 PM on March 13, 2025, will not be accepted. Answers will be released in online for everyone to review. The Contractor shall possess a valid Class A or C12 Contractor's License for the State of California, at the time of submitting bids . The Bidder shall guarantee the total bid price for a period of 120 calendar days from the date of bid opening. The Contractor shall pay the general prevailing rate of per diem wages as determined by the Director of the Department of Industrial Relations (DIR) of the State of California for the locality where the work is to be performed. All contractors and subcontractors must furnish electronic certified payroll records directly to the Labor Commissioner using the DIR's electronic certified payroll reporting system. The City's Public Integrity Ordinance advances transparency in municipal government and assists public officials in avoiding conflicts of interest. Section 2.60 of the Palm Springs Municipal Code, reflects the City's interest in ensuring companies (and other legal entities that are not natural people) doing business with the community are transparent and disclose to the City the identity of each owner or investor of any disclosed entity who owns a beneficial interest of five percent or more of the entity in question n accordance with the provisions of Section 7.09.030 of the Palm Springs Municipal Code, "Local Business Preference Program", subsection (5) "Local Preference in Public Works Contracts (Sub-Contracting), the prime contractor shall use good faith efforts to subcontract the supply of materials and equipment to local business enterprises and to subcontract services to businesses whose work force resides within the Coachella Valley. he Work is subject to the City's Community Workforce Agreement dated August 31, 2021 ("CWA" or "Project Labor Agreement" or "PLA"), a copy of which is on file with the City, available upon request, and incorporated herein by reference as if fully set forth herein. The Contractor will be required to agree to the following and those further provisions set forth in section 13 to the Agreement of the Contract Documents. Contractor and all subcontractors of Contract of any tier shall at all times, comply with the requirements of the PLA in the prosecution of the Work. Contractor has executed or agrees to execute and be bound by the terms of the PLA either directly or through the Letter of Assent (a form of which is attached to the PLA as "Attachment A" and referred to herein as the "LOA"), and Contractor shall furnish evidence of compliance with the same to City prior to the commencement of any Work. Contractor further agrees to require, or has already required, each of its subcontractors, of whatever tier, to agree in writing in the form of a LOA to be bound by each and every provision of the PLA prior to the commencement of Work, and Contractor shall furnish evidence of compliance with the same to City prior to the commencement of any Work or at the time of such subcontract, whichever occurs first. Question Deadline 03/13/2025 at 12:00 PM PT Online Q&A Yes The City reserves the right after opening bids to reject any or all bids , to waive any informality (non-responsiveness) in a bid, or to make award to the lowest responsive, responsible bidder, and reject all other bids , as it may best serve the interest of the City. If there are multiple and/or alternative bid schedules, bidders are required to complete and submit a bid on all bid schedules. A retention on progress payments is withheld per the Special Provisions of the Contract Documents. The Contractor may elect to receive 100 percent of payments due, from time to time, without retention of any portion of the payment by the City, by depositing securities of equivalent value with the City in accordance with the provisions of Section 22300 of the Public Contract Code. Liquidated Damages $5,400
Award
Roads / Highways
$7,903,650.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
13
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 19, 2025
May 19, 2025
To Be Determined, Palm Springs, CA
Related To This Project
Palm Springs, CA
Bid Date: Apr 21 2025
Palm Springs, CA
--
Palm Springs, CA
--
Palm Springs, CA
--
Palm Springs, CA
Bid Date: May 07 2025
Palm Springs, CA
--
Palm Springs, CA
--
Palm Springs, CA
Bid Date: May 23 2025
Palm Springs, CA
Bid Date: Mar 27 2025
Palm Springs, CA
Bid Date: Mar 28 2025
Palm Springs, CA
Bid Date: Mar 31 2025
Palm Springs, CA
Bid Date: Mar 28 2025
Palm Springs, CA
Bid Date: Mar 19 2025
Palm Springs, CA
Bid Date: Mar 19 2025
Palm Springs, CA
Bid Date: Mar 04 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.