Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 7, 2025 at 8:00 PM
Updated April 9, 2025
Renovation of a water / sewer project in Wiggins, Colorado. Completed plans call for the renovation of a water / sewer project.
The Fort Morgan Water Treatment Plant currently has an Allen-Bradley SLC500 PLC based automation system with an Iconics HMI for control, interface, alarming and alarm notification. Allen Bradley has announced the SLC500 platform reached its end of life as of March 2024, meaning modules and processors are officially discontinued or supported. The PLC platform needs to be updated to avoid future issues related to reliability and replacement module availability. The HMI interface (Iconics) and the corresponding IO servers (Software Toolbox) are currently running on three PC's located in the plant. The Fort Morgan Water Treatment Plant is requesting proposals from qualified Contractors/Integrators to replace the current system with an Allen Bradly ControlLogix based system. The plan is to replace only the back panels of the current control panels to preserve all of the field devices, power and communication wiring. All processors and IO modules will be replaced. The work includes, but is not necessarily limited to, furnishing of labor and equipment for the installation of six control panels (PCM-1, PCM-2, PCM-3, Filter Console, Trac Vac Control Panel, Polymer Control Panel, Effluent RIO Control Panel, main ethernet switch, driver for SCADA software, control software license, and start-up and testing of the system) in the plant for upgrade. All questions must be in writing and addressed to Andrew Stewart, Project Manager, Merrick & Company, at andrew.stewart@merrick.com. The final day for questions is March 27th, 2025. Each bid shall be accompanied by a bid guaranty bond, or a certified or cashier's check payable to the order of the Owner in an amount not less than five (5) percent of the amount of the bid as a guaranty that the bidder will execute the contract, if awarded, in conformity with the Bid Form. The successful bidder will be required to furnish a Performance Bond and a Payment Bond on forms provided in the Bidding and Contract Documents. Each bond shall be in the amount equal to one hundred percent (100%) of the contract price. The Owner reserves the right to reject bids, to waive any informality in a bid, to readvertise for bids, or to withhold the award for reasons the Owner determines
Post-Bid
Water / Sewer
$1,000,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 8, 2025
May 8, 2025
14625 Co Rd 8, Wiggins, CO
Related To This Project
Wiggins, CO
--
Wiggins, CO
Bid Date: Sep 20 2024
Wiggins, CO
Bid Date: Jun 28 2024
Wiggins, CO
Bid Date: May 05 2023
Wiggins, CO
--
Wiggins, CO
Bid Date: Dec 05 2022
Wiggins, CO
Bid Date: Sep 02 2022
Trinidad, CO
Bid Date: Feb 28 2025
Fort Collins, CO
Bid Date: Mar 31 2025
Denver, CO
Bid Date: Feb 28 2025
Denver, CO
Bid Date: Mar 06 2025
Colorado Springs, CO
Bid Date: Feb 28 2025
Longmont, CO
Bid Date: Mar 24 2025
Greenwood Village, CO
Bid Date: Mar 21 2025
Keystone, CO
Bid Date: Mar 13 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
