Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 19, 2025 at 8:00 PM
Updated March 20, 2025
Site work and paving for a sidewalk / parking lot in Roswell, Georgia. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
This project consists in the construction of approximately 3000 linear feet of a concrete multi-use trail. All questions or requests for clarification must be sent via online and are due by 03/12/2025 at 5:00 PM ET. Questions received after this date and time may not be answered. The City of Roswell reserves the right to reject all bids and to waive technicalities and informalities, and to make an award in the best interest of the City of Roswell 1. This project consists in the construction of approximately 3000 linear feet of a concrete multi-use trail. 2. The scope of work includes the following: a. Traffic control b. Erosion control c. Grading and demolition d. Curb and Gutter e. Concrete median f. Retaining walls g. Storm sewer h. Sanitary sewer i. Water line j. Concrete multi-use trail k. Bio slopes and planters l. Signs and striping m. Traffic signals 3. Provide Line Item, Unit Cost per the schedule of values provided 4. Work hours will be from 7:00 AM until 4:00 PM Monday through Friday 5. No traffic lane closures are allowed before 9:00 AM and after 3:00 PM Monday through Friday when school is in session 1. This project consists in the construction of approximately 1200 linear feet of a concrete multi-use trail. 2. The scope of work includes the following: a. Traffic control b. Erosion control c. Grading and demolition d. Curb and Gutter i. Adjustment of existing western curb and gutter along King Road to accommodate new multi-use trail e. Storm sewer f. Concrete multi-use trail i. 8-ft wide g. Signs and striping h. Traffic signals i. Adjustment of existing RRFB 3. Provide Line Item, Unit Cost per the schedule of values provided 4. Work hours will be from 7:00 AM until 4:00 PM Monday through Friday 5. No traffic lane closures are allowed before 9:00 AM and after 3:00 PM Monday through Friday when school is in session.
GC Bidding
Sidewalks / Parking Lot
$300,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 20, 2025
April 21, 2025
Multiple Locations, Roswell, GA
Related To This Project
Roswell, GA
Bid Date: Mar 20 2025
Roswell, GA
Bid Date: Mar 27 2025
Roswell, GA
Bid Date: Apr 17 2025
Roswell, GA
--
Roswell, GA
Bid Date: May 15 2025
Roswell, GA
--
Roswell, GA
Bid Date: May 29 2025
Roswell, GA
Bid Date: Jun 05 2025
Roswell, GA
Bid Date: Mar 20 2025
Roswell, GA
Bid Date: Mar 07 2025
Roswell, GA
Bid Date: Feb 13 2025
Roswell, GA
--
Roswell, GA
Bid Date: Feb 13 2025
Roswell, GA
--
Roswell, GA
Bid Date: Jan 22 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
