BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 15, 2025 at 8:00 PM

Updated April 16, 2025

Site work, paving and renovation of a mixed-use development in Shawano, Wisconsin. Completed plans call for the renovation of a municipal facility; for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

A. The project is the remodeling and addition to the existing 12,066 square foot Shawano Recreation Center. When completed, the Recreation Center will total 17,711 square feet in size with new and upgrade amenities. o Approximately 4,800 square feet of the existing building will be remodeled which includes: o New Men's Locker Room o New Women's Locker Room o New Family Family Changing Room o New Reception Desk and Check-In o Existing Corridor Interior Finish Upgrades o The New Additions are Approximately 7,500 square feet in size and includes: o A New Classroom for Computer Training o A New Tech Center o Four New Administrative Offices o New Exercise Room with 24/7 Access o A New Gathering Space for Community Gatherings and Computer Stations o Exterior Improvements that include Two Outdoor Seating Areas and Playground Equipment o New Public Toilet Rooms o New Fire Suppression System o New HVAC System o New and Upgraded Lighting and Electrical System. B. Total Renovation o Except for the existing pool space, the entire facility will be renovated to meet current building codes, interior finishes will be modernized, and overall improvement with the interior circulation. C. Building Site Development o Two New Seating Areas for Community Gathering and Reading Areas. o New Playground Equipment with Safety Ground Surface. o New Green Space is being provided with Shrubs and Trees o New Parking and Paved Walkways o With the New Additions, the Building Facade will be Enhanced D. The project will Improve the Site Accessibility and will provide a new and larger entry with Canopy. Each bidder must deposit with his/her bid, an amount to secure the bid and subject to the conditions provided in the information for bidders, in accordance with bidding requirements set forth in Wis.Stats. 66.0901 and 62.15. The contract shall be subject to the Contract Work Hours and Safety Standards Act (CWHSSA), 40 U.S.C. 3702 and 3704, and DOL (29 CFR Part 5); Fair Labor Standards Act (FLSA); and fair labor practices and wage standards for the program under which the contract is funded, and subject to the federal and state equal opportunity provisions, as specified in the bid packet. Small businesses, minority-owned and women-owned business enterprises (MBEs, WBEs), disabled veteran-owned businesses (DVBs), and firms in labor surplus markets are encouraged to participate in the bidding. No bidder may withdraw their bid within 60 days after the date of the opening thereof. OWNER reserves the right to waive any informalities or to reject any or all bids. o Start of Construction, FFP-GA No Later Than: June 27, 2025 o Construction Complete, FFP-GA No Later Than: September 25, 2026

Award

Municipal

$4,681,834.00

Public - City

Paving, Renovation, Site Work

122

24

125

10

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
3
Bidding Soon
472
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2025

June 27, 2025

Project location map

220 E Division St, Shawano, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.