EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 2, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a mixed-use development in Mexico, New York. Completed plans call for site work for a educational facility; and parking garage.

46-09-01-06-0-005-012, 46-09-01-06-0-003-021 46-09-01-06-4-008-010 46-09-01-06-0-002-016 46-09-01-06-0-00--015 For the proposed 2023 Capital Improvements Project located in Mexico, New York 13114. The project consists of the construction of improvements and renovations at Mexico High School, Mexico Middle School, Mexico Elementary, New Haven Elementary, Palermo Elementary and District Bus Garage. Contract 107 Site . The attention of the Bidder is particularly called to the Owner's sales tax exemption, the requirements as to conditions of employment to be observed and the minimum wage rates to be paid under the contract. In addition, the Bidding Documents for this project contain detailed requirements for the qualification of Bidders. These include, among other things, rigid bonding and insurance requirements, financial statements. bank references, lists of lawsuits, arbitrations, or other proceedings in which the Bidder has been named as a party, a statement of surety's intent to issue Performance and Payment Bonds, and a description of other projects of similar size and scope completed by the Bidder. Question Deadline 03/25/2025 at 5:00 PM ET All questions regarding the meaning of the plans, specifications, or other contract documents will not be made verbally. All requests for such information should be made in writing, addressed to: a. Campus Construction Management Group Inc., 1221 Pittsford-Victor Road, Pittsford, NY 14534 Attn: Tim Burke, (585) 825-8855, email: tburke@campuscmg.com & Sara Gray, (585)-626-9022, email: sgray@campuscmg.com. Each Bidder shall deposit with its bid, security in an amount not less than five percent (5%) of the base bid in the form and subject to the conditions provided in the "INSTRUCTIONS TO BIDDERS." No Bidder may withdraw their bid within forty-five (45) days after the actual bid opening. The Owner reserves the right to waive any and all informalities in or to reject any or all bids. The Owner further reserves its right to disqualify Bidders for any material failure to comply with the "INSTRUCTIONS TO BIDDER" The Construction Manager will hold descoping meetings for the apparent low bidders for all contracts on Thursday March 20 and Friday March 21, 2025. At that time apparent low bidders shall be expected to complete, sign and return the pre-award questionnaire within (48) hours after the bid opening Doc Notes: Bidding Documents will be available as of Monday, February 24, 2025. Bidders for Prime Contract Work may obtain Contract Documents from Syracuse Blueprint Company, 825 E. Genesee Street, Syracuse, NY 13210 upon payment of a deposit of $100 per set, and a separate, non-refundable $50 shipping and handling payment for each set (deposit check shall be made payable to the Mexico Academy & Central School District, shipping check made payable to Syracuse Blueprint Company). Alternatively, bidders can provide their UPS or FedEx account information. In lieu of paper bid sets, bidders can view electronic plans and specifications online at no charge. A nonrefundable payment of $25 can be made to obtain digital files visiting online(Click Public Jobs under the Menu Tab on the left-hand side of the plan room homepage. Once you are in the public plan room please select the link for the Mexico Academy & Central School District.) A Bidder, making the deposit required for the Bidding Documents, submitting a Proposal accompanied by a certified check or other security in accordance with the requirements contained in the plans and specifications and public advertisement for bids and if the copy of the plans and specifications used by such Bidder, other than the successful Bidder is returned in good condition within thirty (30) days to Syracuse Blueprint (address above) award of the contract covered by such plans and specifications, or rejection of the Bid, the full amount of such deposit for one copy of the plans and specifications shall be returned to such Bidder, including the successful Bidder. Partial reimbursement, in an amount equal to the full amount of such deposit for one set of plans and specifications per unsuccessful bidder or non- bidder less the actual cost of reproduction of the plans and specifications, shall be made for the return of all other copies of the plans and specifications in good condition within thirty (30) days following the award of the contract or the rejection of the bids covered by such plans and specifications. Bid date notes: Bids shall be prepared as set forth in "INSTRUCTIONS TO BIDDERS", enclosed in a sealed envelope bearing on its face the name and address of the Bidder and the title of the Work to which the bid enclosed relates. If submitting more than one contract, submit each contract bid in a separate envelope. all RFIs must be received by "Tuesday March 25, 2025, at 5:00 pm" in lieu of "Tuesday March 11, 2025, at 5:00 pm"

Post-Bid

Educational

$2,200,000.00

Public - City

Site Work

185

32

2

2

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Temporary Water, Vehicular Access and Parking, Temporary Roads, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Demonstration and Training, Commissioning, General Commissioning Requirements, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation, Polychlorinate Biphenyl Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Specialty Placed Concrete, Post-Tensioned Concrete, Precast Concrete, Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders, Metal Gratings, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Exterior Insulation and Finish Systems, Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Flush Wood Doors, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Panel Doors, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Finishes, Common Work Results for Finishes, Plaster and Gypsum Board, Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Suspension Systems, Lath, Gypsum Lath, Gypsum Plastering, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Static-Control Resilient Flooring, Resilient Athletic Flooring, Terrazzo Flooring, Fluid-Applied Flooring, Carpeting, Tile Carpeting, Wall Finishes, Wall Coverings, Painting and Coating, Painting, Interior Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Storage Specialties, Storage Assemblies, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Computers, Entertainment Equipment, Athletic Equipment, Gymnasium Equipment, Recreational Equipment, Play Field Equipment and Structures, Athletic Field Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Countertops, Furnishings and Accessories, Portable Lamps, Lamps, Bedroom Furnishings, Blankets, Rugs and Mats, Entrance Floor Mats and Frames, Floor Mats, Runners, Furniture, Seating, Chairs, Upholstered Seating, Residential Furniture, Beds, Multiple Seating, Fixed Audience Seating
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks, Lifts, Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Storm Drainage, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Common Motor Requirements for HVAC Equipment, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping Insulation, Instrumentation and Control for HVAC, Instrumentation and Control Devices for HVAC, Direct-Digital Control System for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Air Terminal Units, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units, Air Coils, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Instrumentation and Control for Electrical Systems, Central Dimming Controls, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Controllers, Variable-Frequency Motor Controllers, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Emergency Lighting, Special Purpose Lighting, Security Lighting, Theatrical Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Geosynthetics for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Mowing, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Painted Pavement Markings, Site Improvements, Fences and Gates, Retaining Walls, Planting, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Storm Utility Drainage Piping, Public Storm Utility Drainage Piping, Culverts, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps, Hooks, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
88
Bidding Soon
1,009
All Active Projects
480
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2025

June 2, 2025

img_map_placeholder

Multiple Locations, Mexico, NY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2023 Capital Improvements - Contract 107 Site

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.