Published April 4, 2025 at 8:00 PM
Updated April 5, 2025
Site work and paving for a transportation facility in Buckhannon, West Virginia. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.
**As of April 4, 2025, this project has not yet been awarded. A timeline for award has not yet been established.** Contract No. 1 - Rehabilitate Main Apron, Taxiways B-D, and South Apron Taxilane Marking The bid prices shall include the costs for furnishing labor and materials and performing all work set forth in the Advertisement for Bids, Information for Bidders, Form of Proposal, Standard General Conditions of the Construction Contract, Supplemental General Conditions and Detail Specifications and Drawings prepared by Chapman Technical Group. Immediately following the scheduled closing time for the reception of bids, all proposals which have been submitted in accordance with the required provisions will be publicly opened and read aloud. Question Deadline 03/19/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than 7 days prior to the date for opening of Bids may not be answered The work to be bid upon is generally described as follows: Contract No. 1 - Rehabilitate Main Apron, Taxiways B-D, and South Apron Taxilane Marking The scope of the project is to rehabilitate the Main Apron, Taxiways B-D, and South Apron Taxilane Marking at the Upshur County Regional Airport located near Buckhannon West Virginia. The rehabilitation shall consist of the removal of existing pavement markings and the installation of new permanent markings, all of which will be covered under the Base Bid. The rehabilitation shall also consist of performing crack repair on the pavement surfaces, which will be covered under Additive Alternate No. 1. The project will also include mobilization and any other appurtenances required for a complete project detailed by the plans and specifications prepared by Chapman Technical Group. Construction Time Limits - The Contractor will be required to achieve Substantial Completion within 60 calendar days and final completion and readiness for final payment within 90 calendar days of the effective date of the Notice to Proceed. Liquidated damages will be $300.00 per day for each day after the expiration of the construction time. The main envelope will be opened first and if the required documents are included and appear to be in order, the envelope containing the bid will then be opened and publicly read aloud. If the required documents are not included as part of the bid submittal, the envelope containing the bid will not be opened and the bid will be considered non-responsive and will be returned to the Bidder. A Bidder may not withdraw his/her bid for a period of one hundred fifty (150) days after the date set for opening of bids. Bids shall be accompanied by a certified check or bid bond payable to the Buckhannon-Upshur Airport Authority, Buckhannon, West Virginia, in an amount not less than five percent (5%) of the total amount of the Base Bid and Additive Alternates. Bidders agree to comply with 49 USC 50101, which provides that Federal funds may not be obligated unless all steel and manufactured goods used in AIP funded projects are produced in the United States, unless the Federal Aviation Administration has issued a waiver for the product; the product is listed as an Excepted Article, Material or Supply in Federal Acquisition Regulation subpart 25.108; or is included in the FAA Nationwide Buy American Waivers Issued list. Bidders must complete and submit the Buy American certification included with the Bidding Documents with their bid. The Authority has established a Disadvantaged Business Enterprise (DBE) Program in accordance with the requirements of the U.S. Department of Transportation (DOT). As a recipient of funding from the DOT, the Authority signed an assurance to comply with the provisions of 49 CFR Part 26, "Participation by Disadvantaged Business Enterprise in DOT Programs." This project, due to the amount of federal participation, requires the Contractor to meet a goal for Disadvantaged Business Enterprise participation of 5.2 percent (5.2%). The Contractor will be required to justify the amount of DBE participation which will be utilized or that there was a good faith effort made to allow for DBE participation. It is the policy of the Authority that DBE's, as defined in 49 CFR Part 26, shall have the maximum opportunity to participate in the performance of contracts assisted in whole or part by funds granted by the DOT. The Owner's award of this contract is conditioned upon Bidder or Offeror satisfying the good faith effort requirements of 49 CFR 26.53. As a condition of bid responsiveness, the Bidder or Offeror must submit the following information with their proposal on the forms provided herein: (1) The names and addresses of Disadvantaged Business Enterprise (DBE) firms that will participate in the contract; (2) A description of the work that each DBE firm will perform; (3) The dollar amount of the participation of each DBE firm listed under (1) (4) Written statement from Bidder or Offeror that attests their commitment to use the DBE firm(s) listed under (1) to meet the Owner's project goal (5) Written confirmation from each listed DBE firm that it is participating in the contract in the kind and amount of work provided in the prime contractor's commitment; and (6) If Bidder or Offeror cannot meet the advertised project DBE goal, evidence of good faith efforts undertaken by the Bidder or Offeror as described in appendix A to 49 CFR part 26. The Owner encourages participation by all firms qualifying under this solicitation regardless of business size or ownership. The Authority is an equal opportunity employer and will require the Contractors to adhere to the provisions of this program. The Buckhannon-Upshur Airport Authority reserves the right to reject any and all bids.
Bid Results
Transportation Terminals
$20,180.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 26, 2025
April 25, 2025
630 Airport Rd, Buckhannon, WV
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.