BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 8, 2025 at 8:00 PM

Updated October 9, 2025

Site work for a water / sewer project in Cameron Park, California. Design plans call for site work for a water / sewer project.

As of October 8, 2025, an engineering firm has been awarded regarding the previous solicitation. Information regarding a timeline for construction has not been determined. .................................... El Dorado Irrigation District (District), an irrigation special district organized and existing under the California Irrigation District Law (Water Code 20500, et seq.), hereby gives notice that it is now accepting proposals for engineering professional services for the District's Deer Creek Waste Water Treatment Plant Sinkhole Repair Project as described in this Request for Proposals (RFP). The District is located in El Dorado County, on the western slope of the Sierra Nevada Mountains. Its contiguous service area covers approximately 220 square miles and 125,000 residents, ranging from El Dorado Hills in the west to Strawberry in the east, and from the South Fork American River in the north to the Cosumnes River in the south. The District also owns and operates Project 184, a FERC-licensed hydroelectric project including high mountain lakes in the vicinity of Lake Tahoe. The District provides treated water, wastewater treatment and disposal, recycled water, and recreation services and operates FERC Hydroelectric Project 184. It is a local public agency, governed by a five-member, elected board of directors with approximately 220 employees. Additional information about the District is available at its website online. The District's Deer Creek Wastewater Treatment Plant (DCWWTP) experienced a sinkhole that developed adjacent to the sludge dewatering building. The sinkhole was identified on the 1996 DCWWTP Phase 2 drawings as an abandoned vertical shaft. An initial investigation of the sinkhole found it to be approximately 30 feet deep from the top of pavement and had an estimated diameter of 8 feet with groundwater being identified at 21 feet from top of pavement. Question Deadline 03/19/2025 at 3:00 PM PT Any questions regarding information within this RFP shall be submitted in writing via email to the Project Manager Mr. Patrick Wilson at pwilson@eid.org. Construction August 2025 - September 2025 -orSeptember 2025 - October 2025. The El Dorado Irrigation District reserves the right to waive informalities or technicalities in proposals. The District reserves the right to reject any or all proposals and to re-issue this RFP. The District may waive any minor informalities or irregularities in any proposal that are immaterial and inconsequential in nature. The District reserves the right to request additional written or oral information from proposers to obtain clarification of their proposals. Pre bid notes: Sign-in begins at 9:00 a.m. and ends at 9:15 a.m. Attendees will be expected to tour the job site during the pre-proposal meeting. Please advise the Project Manager, Patrick Wilson, well in advance of the meeting if you need special accommodations. Reasonable efforts will be made to accommodate your needs. To qualify to propose on this Project, all company representatives must sign in by 9:15 a.m. and submit a signed WAIVER AND GENERAL RELEASE FOR ACCESS TO DISTRICT PROPERTY as attached in EXHIBIT C. Attendees that arrive at 9:15:01 a.m. or after, as determined by the computer clock located at the front desk of the 1st floor lobby of the El Dorado Irrigation District's Customer Service Building, will not be allowed to sign-in and continue in the bidding process, but may enter the meeting in progress upon submission of a signed WAIVER AND GENERAL RELEASE FOR ACCESS TO DISTRICT PROPERTY as attached in EXHIBIT C. All who attend the mandatory pre-proposal meeting and job walk will be required to provide their own personal transportation to and from the Project site. The method of Contractor Selection has not been Determined at this time.

Design

Water / Sewer

$25,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
320
Active Projects
159
Bidding Soon
2,205
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.