BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 29, 2025 at 8:00 PM

Updated October 30, 2025

Site work and paving for a mixed-use development in Normal, Illinois. Completed plans call for site work for a educational facility; for paving for a educational facility; sidewalk / parking lot; and sidewalk / parking lot.

Contractors shall provide all labor, equipment, and materials for the Illinois State University Bone Student Center Parking Lot project. This project will have multiple prime contracts including a General Construction Contract and an Electrical Contract. Work to include but is not limited to the removal and replacement of existing asphalt and concrete in the parking areas, drop off areas, modified parking entrances, landscaping and pedestrian paving updates, lighting replacement, restriping, addition of new parking controls and all associated data and electrical work, and new vehicle entrance including canopies and pre-fabricated booth. Refer to Division 01 for the technical specifications for a complete, detailed breakdown of the contractor specific base bids for this project. Initial parking lot completion for owner operation shall be by August 8, 2025. Substantial project completion shall be subsequently scheduled for October 30, 2025. General Construction Contract Scope of Work: Work of the General Construction Contract includes, but is not limited to, the following: Work identified as inclusive of the General Construction Contract, remaining work not identified as work under other contracts, selective site demolition and earthwork. Site improvements including roadways, parking lots and pedestrian paving, site development furnishings and equipment, and landscaping. Miscellaneous items, including installation of metal panels, PV, parking controls or as otherwise shown in the drawings. Owner furnished, contractor installed related items. Contractors will be responsible to coordinate lead times of all materials and the overall project schedule to complete the project on time. Any additional costs to expedite materials or source alternate/substitutions will be borne by the contractor. Also see the temporary facilities controls listed in the technical specification for the General Construction Contract. There is a 9% BEP goal for the General Prime and an 11% BEP goal for the Electrical Prime for this procurement. Separate University-supplied NIGP commodity code lists have also been provided for each prime. See solicitation documents for details. More information regarding the BEP goals will be shared during the pre-bid meeting. For instructions on how to obtain a comprehensive purchase description, disclosure or contract forms, contact: Mary Kate Schopp 100 S Fell Ave, Ste D CampusBox 1220 Normal, Il 61970-1220 Purchasing Website

Award

Sidewalks / Parking Lot

$68,972.00

Public - State/Provincial

Paving, Site Work

42

24

16

2

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
73
Bidding Soon
1,195
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2025

April 21, 2025

Project location map

200 N University St, Normal, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.