Published March 14, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of a clubhouse / community center in Pittsburgh, Pennsylvania. Completed plans call for the renovation of a clubhouse / community center.

For more information or questions, please contact Kathleen Obringer at 412-643-2766 or kathleen.obringer@hacp.org 1. Carefully remove approximately 100 glass blocks, approximate size 5"x 5"x3" (to be verified in field by Contractor) at various locations at 4 buildings with 13 different addresses per Attachment A. 2. Furnish approximately 100 glass blocks - where damaged glass blocks were removed, per Attachment A. 3. The glass blocks will be products of Pittsburgh Glass, Corning, or approved equal. Contractor is to submit a sample with the Manufacturers' cut sheets, product data, etc. 4. Provide necessary steel lintels and/or angles at the window openings after the old ones are removed. Paint as needed in the field to match existing. 5. Provide grout, appropriate for glass block, silicone, or as approved by HACP. Color to match existing. 6. Provide scaffolding or bucket lift as required for installation. Contractor is to visit the site to evaluate existing conditions, the height ofthe removal and installation of glass blocks, etc. 7. The Authority will provide temporary water/electricity to the extent possible. It is the Contractor's responsibility to verify the availability of the same and advise HACP accordingly. Ifit is not practical to access the power, Contractor shall provide its own generator for power supply. 8. Buildings will be occupied during the work and Contractor shall take all necessary precautions to ensure the safety of residents during this work. 9. All work areas will be cleaned completely after work, at the end of each work day. Areas will be protected for safety until final completion of work and acceptance by HACP. 10. Contractor to Provide its own security if warranted.

Sub-Bidding

Clubhouse / Community Centers

$23,921.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Glass Unit Masonry

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
66
Bidding Soon
932
All Active Projects
452
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2025

April 17, 2025

img_map_placeholder

Multiple Locations, Pittsburgh, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Arlington Heights Glass Block Removal and Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.