Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 21, 2025 at 8:00 PM
Updated May 16, 2025
Site work for a water / sewer project in Alvin, Texas. Completed plans call for site work for a water / sewer project.
This project consists of the expansion of Lift Station 23 from a firm capacity of 2.02 MGD to a firm capacity of 9.0 MGD. Work includes all site work, structural, mechanical, electrical, and control components of the lift station, fencing, pavement, gravity sanitary sewers, force main, manholes, and all appurtenances necessary to deliver a complete and operational lift station to the owner. The scope of work also includes the construction of approximately 5,000 linear feet of 24-inch force main along HWY 35 Bypass, approximately 23,000 linear feet of gravity sanitary sewer, ranging in size from 30-inch to 15-inch, and the rehabilitation of approximately 1,800 linear feet of 30-inch gravity main along HWY 35 Bypass and 1,300 linear feet of 12-inch gravity main along Gordon, including all manholes, connections to existing facilities, and all necessary appurtenances to complete the project. Award of this contract is anticipated to occur in March 2025 furnishing all plans, labor, material, and equipment, and for performing all work required for construction of: Lift Station 23 Expansion & Elimination of Lift Stations 1, 15, 16, & 43 The City of Alvin will be bound by the terms of this invitation only to the extent funds, from whatever source, are available. All bids must be accompanied by pro-posal guaranty in the form of a Certified or Cashier's Check, or Bidders Bond drawn to the order of the City of Alvin, and in the minimum amount of five percent (5%) of the total amount of the bid. No proposal may be withdrawn for a period of ninety (90) days after receipt of bids except with the approval of the City of Alvin. The City of Alvin reserves the right to reject any or all bids or to accept any bid from any responsible person which will be most advantageous to it and results in the best and most economical completion of the proposed improvements, facilities, works, equipment and appliances. The successful bidder will be required to provide a Performance Bond and Payment Bond in full amount of the contract.
Bid Results
Water / Sewer
$33,245,337.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 18, 2025
April 17, 2025
Multiple Locations, Alvin, TX
Related To This Project
Alvin, TX
Bid Date: Mar 13 2025
Alvin, TX
Bid Date: Apr 15 2025
Alvin, TX
--
Alvin, TX
--
Alvin, TX
--
Alvin, TX
--
Alvin, TX
--
Alvin, TX
Bid Date: Mar 18 2025
Alvin, TX
Bid Date: Mar 24 2025
Alvin, TX
Bid Date: Feb 18 2025
Alvin, TX
Bid Date: Feb 18 2025
Alvin, TX
Bid Date: Feb 18 2025
Alvin, TX
Bid Date: Feb 18 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
