Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 21, 2025 at 8:00 PM
Updated October 1, 2024
Renovation of a mixed-use development in Boston, Massachusetts. Completed plans call for the renovation of a educational facility.
The Designers Basic Services shall include: all investigative work, design work, preparation of construction documents, bidding period administration, construction administration, construction closeout, and other related work. Question Deadline: March 14, 2025 at 5:00 P.M Section 12 is intended for projects on which a designer contracts with an agency of the Commonwealth. MSBA-funded projects should not be included as work for the Commonwealth. Cities, towns, and regional school districts are the owner for MSBA funded projects As stated in the RFR under Section IV Response Requirements, (1)(b), applicants must have an up-to-date Master File Brochure on file at the MSBA Additionally, the cover letter must also acknowledge that the Respondent has read and takes no exceptions the current version of the MSBAs Standard Contract for Heat Pump Designer Services (MSBA Accelerated Repair Program) and Contract for Heat Pump Designer Services Amendment (Attachment C). No, consultants previously involved with the MSBA Heat Pump study are not precluded from submitting a response Please refer to Section I. Summary for a summary of the scope of the Heat Pump Designers requested responsibilities. In part this summary states: For heat pump conversion projects, Designers will be responsible for all existing HVAC system investigation work, design work, preparation of construction documents, bidding period administration, construction administration, coordination with the Commissioning Consultant, construction closeout and other related work necessary to meeting the projects scope and schedule. MSBA understands that Designers may find it necessary on some proposed projects to also design and include electrical service upgrades in the project scope in consultation with the District and OPM. MSBA understands that a ground source heat pump (GSHP) system includes the well field, underground vault(s), and related piping connections into the building. MSBA also understands that disturbed site surfaces should be expected to be returned to the existing conditions prior to construction No. All projects in the Accelerated Repair Program, regardless of project cost, are assigned an Owners Project Manager.
Post-Bid
Educational
$350,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 03 - Concrete
Division 05 - Metals
Division 10 - Specialties
Division 21 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 31, 2025
July 31, 2025

To Be Determined, Boston, MA
Related To This Project
Boston, MA
Bid Date: Mar 05 2025
Boston, MA
Bid Date: Apr 11 2025
Boston, MA
Bid Date: Apr 08 2025
Boston, MA
Bid Date: Apr 07 2025
Boston, MA
Bid Date: Apr 07 2025
Boston, MA
Bid Date: Mar 26 2025
Boston, MA
Bid Date: Apr 07 2025
Boston, MA
Bid Date: Mar 13 2025
Boston, MA
Bid Date: Apr 28 2025
Boston, MA
Bid Date: Mar 18 2025
Terminal B Hvac Replacement Project, Fanrooms 10 &12 Logan International Airport - General - 5706622
Boston, MA
Bid Date: Apr 02 2025
Boston, MA
--
Boston, MA
Bid Date: Apr 03 2025
Boston, MA
--
Boston, MA
Bid Date: Mar 20 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
RFP - D/B MSBAs Accelerated Repair Program for Heat Pump Conversion Projects
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.