BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 6, 2025 at 7:00 PM

Updated March 13, 2025

Site work for a road / highway in Islay, Alberta. Completed plans call for site work for a road / highway.

Generally, the Work consists of the following: Micro-Surfacing treatment on the following roadway: Township Road 510 from Highway 897 to Highway 17, which is approximately 21.0km in length. Graded Aggregate Seal Coat on the following roadway: Township Road 505/505a/510 from the Town of Vermilion limits (32 Street) to Range Road 55, which is approximately 7.2km in length. Both sections of roadway are located within the County of Vermilion River. Isolated patching may be required prior to the placement of the surface treatment. Question Deadline 03/06/2025 at 2:00 PM MT

Post-Bid

Roads / Highways

$250,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
22
Bidding Soon
423
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2025

June 1, 2025

Project location map

Multiple Locations, Islay, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.