BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 21, 2025 at 8:00 PM

Updated March 28, 2025

Site work and paving for a sidewalk / parking lot in Lexington, Massachusetts. Completed plans call for site work for a sidewalk / parking lot.

Project Cedar Street Sidewalk - Construction of a 4,000' sidewalk along Cedar Street in Lexington. Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. SCOPE OF WORK The work under this contract consists of furnishing all necessary labor, materials, equipment and services to complete roadway improvements as described herein under the CEDAR STREET SIDEWALK CONTRACT #25- 84. The work under this contract consists of the construction of a new sidewalk on Cedar Street between Winding Road and Massachusetts Avenue, as well as a new crosswalk at the intersection of School Street and Rolling Lane. The work includes hot mix asphalt curb and berm installation, granite curb installation, hot mix asphalt sidewalk and driveway installation, minor roadway box widening, catch basin, gutter inlet and drain pipe installation, cement concrete pedestrian ramp construction, pavement marking installation and removal, tree clearing and tree protection, stone masonry wall construction, loose stone wall removed and reset, grading, loam and seed and mulch installation, temporary traffic control management, and various other appurtenant work. The installation of sloped face granite curb, granite splayed ends, and granite transition curb as an alternative to the hot mix asphalt curb is included in the contract under Add-Alternate 1. All work under this contract shall be done in conformance with the Commonwealth of Massachusetts Department of Transportation Standard Specifications for Highways and Bridges dated 2024, and the Supplemental Specifications contained in this contract; the 2017 Construction Standard Details, the 1990 Standard Drawings for Signs and Supports; The 2015 Overhead Signal Structure and Foundation Standard Drawings, the 2009 Manual on Uniform Traffic Control Devices (MUTCD) with Massachusetts Amendments and the Standard Municipal Traffic Code; the 1968 Standard Drawings for Traffic Signals and Highway Lighting; the latest edition of American Standard for Nursery Stock; the Plans and these Special Provisions. The following is the anticipated scope of work based on the construction shown on the plans. The engineer has the authority to adjust these as they see fit; • Construct an asphalt sidewalk along Cedar Street. • Install hot mix asphalt and granite curb as shown on the plans. • Construct accessible pedestrian curb ramps, and crosswalks as shown on the plans. • Install pavement markings as shown on the plans. • Install gutter inlets, catch basins, and drain pipe as shown on the plans. • Minor roadway box widening on Cedar Street. • Tree clearing, tree protections, and proposed plantings as shown on the plans. • The hours of operation will be Monday through Friday 7:00am to 4:00pm. Modifications to this schedule will be discussed on a case by case basis. • Additional work outside of that shown on the plans may be added (or work deleted) in other areas of town which may include work similar to the scope of this project. • The contractor will provide all required work zone and detour signs and barricades

Post-Bid

Sidewalks / Parking Lot

$1,400,000.00

Public - City

Paving, Site Work

25

5

6

2

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
578
Active Projects
226
Bidding Soon
4,063
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2025

May 20, 2025

Project location map

Cedar St, Lexington, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.