EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 8, 2025 at 8:00 PM

Updated October 1, 2024

Site work, paving, new construction and renovation of a mixed-use development in Middle Township, New Jersey. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; transportation facility; transportation facility; water / sewer project; for the construction of a 12,000-square-foot transportation facility; and for the renovation of a transportation facility.

The project is located at Cape May Airport (WWD), 507 Terminal Drive, Rio Grande, New Jersey and generally consists of the construction of a new, approximately 12,000 SF, public-use hangar building. The Contractor will be responsible for all architectural and structural elements of the building, including all mechanical, plumbing, electrical, fire protection, and fire alarm systems. Work will include, but not be limited to, pavement demolition, grading, concrete paving, drainage, security fence and gates, water and sewer lines, electrical and communication conduits, sidewalks, and landscaping. Estimated Start Date: 04-01-2026 Estimated Finish Date: 12-26-2026 Bid Bond/Guarantee Required Yes : 10.00 % Question deadline - 1 April 2025

Post-Bid

Transportation Terminals

$800,000.00

Public - City

New Construction, Paving, Renovation, Site Work

46

5

10

7

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Grading, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
86
Bidding Soon
1,109
All Active Projects
548
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2025

April 1, 2026

img_map_placeholder

507 Terminal Dr, Middle Township, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Public Use Hangar

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.