Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 5, 2025 at 7:00 PM
Updated November 8, 2025
Demolition and site work for a civil project in Plantation, Florida. Working plans call for the demolition of a water / sewer project; and for site work for a water / sewer project.
As of November 5, 2025, bids have been rejected. It is unknown at this time if or when the project will rebid, per the owner. Once the Solicitation has been issued, a Cone of Silence will be implemented. At that time communication with the CITY is limited to the Procurement Department. During the solicitation advertising, review and evaluation process no person shall make any private or separate delivery of marketing information concerning any Bidder/Proposer to any elected officers of the City, members of the City staff or members of the Evaluation Committee. Cone of Silence shall terminate at the time the City makes an award to a Bidder(s)/Proposer(s) that becomes final as a result of no procurement protest being filed or takes other action that ends this solicitation. Any action of a Bidder/Proposer in violation of this may be cause for disqualification of the Bidder/Proposer. Minority-Owned, Woman-Owned, and Small Business Enterprises are encouraged to respond to this solicitation. All questions may be addressed in writing to the Assistant Procurement Director, Asha Edwards, 400 NW 73 rd Avenue, Plantation Florida 33317. Asha Edwards can be reached at 954- 797-2205, Monday through Friday, 8AM to 4:30PM, Email: aedwards@plantation.org. Question Deadline 03/21/2025 GENERAL DESCRIPTION OF SCOPE OF SERVICES: • THE CITY IS REQUESTING BIDS FOR THE REPLACEMENT OF THE EXISTING LIFT STATION #73 IN THE CITY OF PLANTATION. THE WORK SET FORTH WITHIN THESE BID/PROPOSAL DOCUMENTS INCLUDES THE FURNISHING OF ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, COORDINATION AND INCIDENTALS FOR DEMOLISHING THE EXISTING DRYWELL AND ALL EQUIPMENT, CONVERTING THE EXISTING WET-WELL TO A MANHOLE, INSTALLING AN ADDITIONAL MANHOLE, WET-WELL, VALVE VAULT, NEW PUMPS, PIPING, VALVES, FITTINGS, AND ELECTRICAL EQUIPMENT, CONNECTION TO EXISTING FORCEMAIN, NEW ELECTRICAL SERVICE AND EQUIPMENT, TREE REMOVAL, MISCELLANEOUS DEMOLITION, AND ALL OTHER WORK SHOWN ON THE DRAWINGS. MAINTENANCE OF ALL UTILITY SERVICES INCLUDING SANITARY SERVICE IS MANDATORY THROUGHOUT THE CONSTRUCTION PERIOD.
Final Planning
Water / Sewer
$1,693,467.00
Public - City
Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2025
June 1, 2026
1331 NW 73rd Ave, Plantation, FL
Related To This Project
Plantation, FL
Bid Date: Nov 04 2025
Plantation, FL
--
Plantation, FL
--
Plantation, FL
Bid Date: Mar 11 2025
Plantation, FL
Bid Date: Mar 11 2025
Plantation, FL
Bid Date: Oct 17 2025
Plantation, FL
Bid Date: Mar 11 2025
Plantation, FL
--
Plantation, FL
--
Plantation, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
