BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 25, 2025 at 8:00 PM

Updated April 26, 2025

Site work and paving for a mixed-use development in Menlo Park, California. Completed plans call for site work for a educational facility; playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; educational facility; and water / sewer project.

The project will include traffic calming improvements along Middle Avenue from El Camino Real to Olive Street. The scope of work general consists of new signing and striping (including bicycle lanes), curb ramps, drainage gutters, speed humps, rectangular rapid flashing beacons, and asphalt resurfacing within the project corridor. The project will enhance safety for pedestrians and bicyclists, reduce vehicle speed and improve connectivity to schools, parks, stores, and adjacent neighborhoods. Bidders shall refer to the following specifications and project plans for additional information. Engineers estimate for Base Bid is $2,000,000. Type of Award Lump Sum License Requirements Class A Liquidated Damages $1,500 per day Project Duration 70 working days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Question Deadline 03/13/2025 at 5:00 PM PT Online Q&A Yes Please note answers to Q&A will be posted to electronically on March 20, 2025. Contact Info Jordan Chu 650-330-6782 PWSupportStaff@menlopark.gov The City does not have any DBE goals for this project

Award

Roads / Highways

$1,507,400.00

Public - City

Paving, Site Work

56

10

2

5

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
455
Active Projects
212
Bidding Soon
2,516
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2025

May 26, 2025

Project location map

Middle Ave, Menlo Park, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.