Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 19, 2025 at 8:00 PM
Updated January 31, 2026
Site work for a municipal facility in San Diego, California. Completed plans call for site work for a municipal facility.
Proposed Board Approval Aug / Sept 2025 Question Deadline 07/03/2025 4:00 PM (PDT) Questions or comments regarding this specification must be submitted electronically to our eBid system Document No. 78183 In accordance with the Contract documents, the Contractor shall furnish all labor, materials, equipment, transportation, supplies, systems, and disposal as necessary to complete the construction of Navy Pier Freedom Park Construction, San Diego, CA, as shown in Drawing No. EM-2024-04R and as described in Specification No. 2024-24R of the San Diego Unified Port District This bid Specification No. 2024-24R is a rebidding of Specification No. 2024-24 in which the sole bid $2,740,403.00 was rejected on June 6, 2025, by the Board of Port Commissioners due to the bid being significantly above the engineer's estimate and currently available funding from third-party-payor Midway. The engineer estimate for Specification No. 2024-24R rema ns $1,345,000.00 and funding significantly above that amount is not available from third-party-payor Midway. The total contract duration is 120 calendar days. The Work shall include, but not limited to, the following. 1. Jet grouting along approximately 380 linear feet of retaining wall within the limits as shown in the plans including related mobilization and demobilization. 2. Project Management and Coordination including but not limited to On-Site Work Hours, Work Coordination and Notifications with the District, tenants, and the public. 3. Coordination and compliance with applicable local, state, and federal regulatory requirements including but not limited to Vehicular and Pedestrian Safety, Construction Pollution Prevention Plan (Exhibit B, Coastal Development Permit, In-water work (Exhibit C, ACOE RGP 72), Construction Debris Removal and Disposal. 4. Prior to submitting a bid price for Jet Grouting, the grouting Contractor shall conduct a site inspection and review available subsurface information (including geotechnical borings). Prior to bid, Contractor shall verify the suitability of his methods for the project based on the conditions indicated by the subsurface information provided. 5. It is intended that the Work be completed in every respect under the Contract Document, and such items or details not mentioned above or not included in the Bid Schedule that are required by the Contract documents (as defined in Subsection 5.1.2.6 of the General Conditions) shall be furnished, performed, placed, constructed, or installed by the Contractor. It is intended that the Work be completed in every respect under the Contract Document, and such items or details not mentioned above or not included in the Bid Schedule that are required by the Contract documents (as defined in Subsection 5.1.2.6 of the General Conditions) shall be furnished, performed, placed, constructed, or installed by the Contractor. The total contract duration is 120 calendar days. Q&A Deadline July 3, 2025 4:00 PM (PDT)
Award
Municipal
$2,556,403.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 21, 2025
October 1, 2025
To Be Determined, San Diego, CA
Related To This Project
San Diego, CA
Bid Date: Jun 09 2025
San Diego, CA
Bid Date: Apr 02 2025
San Diego, CA
--
San Diego, CA
--
San Diego, CA
Bid Date: Mar 14 2025
San Diego, CA
Bid Date: Apr 01 2025
San Diego, CA
Bid Date: Apr 02 2025
San Diego, CA
Bid Date: Mar 20 2025
San Diego, CA
Bid Date: Mar 24 2025
San Diego, CA
--
San Diego, CA
--
San Diego, CA
Bid Date: Mar 18 2025
San Diego, CA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
