BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 19, 2025 at 8:00 PM

Updated May 20, 2025

Site work and outdoor lighting for a road / highway in Gretna, Louisiana. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

Without limiting the scope of work described herein, the proposed bid provides for installation of lighting pole foundations, grounding, raceway, excavation and backfill, removal and replacement of concrete sidewalks, removal and replacement of sod, and all other incidental work thereto. Hpl Street Lights 11th Street to Wbe - Huey P. Long Avenue Street Lighting 11th Street to Westbank Expressway Bids will be received on a unit price basis as described in the Contract Documents. All work is to commence immediately after the Date of Contract. Completion of the work is required within 60 calendar days. All time limits commencing upon the date of issuance by registered mail of the Owner's "Notice to Proceed." Bid security in the amount of 5 percent (5%) of the total Bid must accompany each Bid. The successful Bidder will be required to furnish a Performance and Payment Bond guaranteeing faithful performance and the payment of all bills and obligations arising from the performance of the contract. No Bid may be withdrawn within a period of 45 days after the date fixed for opening Bids. The City of Gretna reserves the right to reject all Bids, and to reject nonconforming, nonresponsive, or conditional Bids. Doc Notes: All Bids must be in accordance with the Contract Documents on file at the office of BURK-KLEINPETER, INC., Consulting Engineers, 2400 Veteran's Blvd., Suite 310 Kenner, Louisiana 70062. Deposit on the first set of documents furnished bona fide prime bidders will be fully refunded upon return of the documents in good condition no later than ten calendar days after receipt of bids. On other sets of documents furnished to prime bidders, the deposit less $25.00 will be refunded upon return of the documents in good condition no later than ten calendar days after receipt of bids. Good condition is defined as free of all pencil, pen and other marks. All sets furnished to subcontractors and suppliers are non-refundable. Partial sets will not be issued. Request for mailing Contract Documents will be handled by Federal Express only, provided the addressee supplies his courier's account number and "street" address.

Bid Results

Roads / Highways

$270,100.00

Public - City

Outdoor Lighting, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
0
Bidding Soon
345
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2025

May 12, 2025

Project location map

Multiple Locations, Gretna, LA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.