BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 9, 2025 at 8:00 PM

Updated May 10, 2025

Site work and paving for a road / highway in Kalaheo, Hawaii. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Furnishing and Paying for all materials, labor, transportation, tools, equipment, machinery and services necessary to construct in place complete: WAWAE ROAD LANDSLIDE EMERGENCY REPAIR for the Department of Public Works, Roads Division, County of Kauai. The Director of Finance reserves the right to cancel this Invitation for Bid or to reject any or all bids in whole or in part if deemed to be in the best interest of the County. Stabilizing road embankment slopes with soil nails, shotcrete, and mechanically stabilized earth walls. Cold planing, demolition, removal and disposal of existing pavements, curbs, gutters, trees, and other incidentals necessary to install proposed improvements as determined by the contractor in consultation with the Officer-in-Charge. The Officer-in-Charge will determine which area the Contractor will pave first. Reconstruction of concrete curbs and/or gutters and sidewalks, as applicable if damaged by the contractor during the prosecution ofwork. Reconstructing pavement with a minimum 2 inches thick Asphalt Concrete Pavement, Hot Mix Asphalt, State Mix V, minimum 4 inches Asphalt Treated Base, and minimum 6 inches thick Aggregate Base Course or as directed by the Officer-in-Charge. The contractor shall provide a smooth riding surface. mproving or maintaining road drainage. On roads with properly functioning drainage flow pattern, the Contractor shall maintain the existing drainage pattern. At locations with faulty drainage issues, the Contractor shall submit to the Officer-in-Charge the method in which drainage can or cannot be corrected before work begins. No ponding within the resurfaced pavement area will be permitted. The contractor shall resolve drainage/ponding issues. Ifponding occurs after new pavement is constructed, Contractor is responsible to fix that ponding at their cost.

Award

Roads / Highways

$1,987,210.00

Public - County

Paving, Site Work

20

9

2

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
0
Bidding Soon
12
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2025

May 12, 2025

Project location map

Wawae Rd, Kalaheo, HI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.