Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 15, 2025 at 8:00 PM
Updated October 1, 2024
Site work for a civil project in Milwaukee, Wisconsin. Completed plans call for site work for a water / sewer project.
The Contractor shall furnish all labor, materials, equipment, and incidentals necessary for the removal and replacement of two 36-inch magnetic flow meters at the Inline Storage System (ISS) Pump Station of the Jones Island Water Reclamation Facility (JIWRF). These meters measure discharge flow exiting the ISS (Deep Tunnel) during tunnel pump operations. The scope includes the procurement, delivery, installation, integration, commissioning, and necessary modifications to ensure full operational functionality. Question Deadline 03/24/2025 Directed in writing to Nathan Churchill, Owner's Procurement Specialist, at nchurchill@mmsd.com no later than three days before the Bid opening date. Purchase and deliver two new Krohne magnetic flow meter to JIWRF 2. For each of the two meters (#1 and #2): a) Remove and dispose of existing flow meter and associated appurtenances. b) Install new meter, gaskets, grounding rings, control wiring and all required appurtenances. c) Provide adequate structural support for new flow meter. d) Coordinate with manufacturer for commissioning and training. e) Work with Owner to ensure integration of new meter into plant SCADA system. f) Conduct a test run and obtain operational acceptance from the Owner. 3. Work on Flow Meter #3 (Existing Meter) a) Provide adequate structural support for meter #3.
GC Bidding
Water / Sewer
$700,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 27, 2025
April 28, 2025
700 E Jones St, Milwaukee, WI
Related To This Project
Milwaukee, WI
Bid Date: Apr 01 2025
Milwaukee, WI
Bid Date: Mar 25 2025
Milwaukee, WI
Bid Date: Mar 31 2025
Milwaukee, WI
--
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Mar 18 2025
Milwaukee, WI
Bid Date: Mar 11 2025
Milwaukee, WI
Bid Date: Mar 13 2025
Milwaukee, WI
Bid Date: Mar 20 2025
Milwaukee, WI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
ISS Pump Station Flow Meters Replacement at the Jones Island Water Reclamation Facility
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.