EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 15, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a civil project in Milwaukee, Wisconsin. Completed plans call for site work for a water / sewer project.

The Contractor shall furnish all labor, materials, equipment, and incidentals necessary for the removal and replacement of two 36-inch magnetic flow meters at the Inline Storage System (ISS) Pump Station of the Jones Island Water Reclamation Facility (JIWRF). These meters measure discharge flow exiting the ISS (Deep Tunnel) during tunnel pump operations. The scope includes the procurement, delivery, installation, integration, commissioning, and necessary modifications to ensure full operational functionality. Question Deadline 03/24/2025 Directed in writing to Nathan Churchill, Owner's Procurement Specialist, at nchurchill@mmsd.com no later than three days before the Bid opening date. Purchase and deliver two new Krohne magnetic flow meter to JIWRF 2. For each of the two meters (#1 and #2): a) Remove and dispose of existing flow meter and associated appurtenances. b) Install new meter, gaskets, grounding rings, control wiring and all required appurtenances. c) Provide adequate structural support for new flow meter. d) Coordinate with manufacturer for commissioning and training. e) Work with Owner to ensure integration of new meter into plant SCADA system. f) Conduct a test run and obtain operational acceptance from the Owner. 3. Work on Flow Meter #3 (Existing Meter) a) Provide adequate structural support for meter #3.

GC Bidding

Water / Sewer

$700,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
113
Bidding Soon
1,465
All Active Projects
778
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2025

April 28, 2025

img_map_placeholder

700 E Jones St, Milwaukee, WI

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

ISS Pump Station Flow Meters Replacement at the Jones Island Water Reclamation Facility

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.