BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 2, 2025 at 8:00 PM

Updated April 3, 2025

Site work and paving for a mixed-use development in Fairport, New York. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Construction of site improvements to the Town of Perintons Fellows Road Park Project Duration 185 days The project consists of construction of site improvements to the Town of Perinton’s Fellows Road Park located at 499 Fellows Road. Site improvements are being completed in conjunction with improvements to the Park drainage pond, which will be constructed simultaneously with the site improvements by the Owner. The site improvement contract includes completion of select site demolition work, including storm sewer removals, asphalt sidewalk removals, selective sawing and concrete sidewalk removals, sign removals, and tree removals, the installation and maintenance of site erosion and sediment control measures, as required by the project Storm Water Pollution Prevention Plan, site electrical construction, including electric vehicle charging stations,site excavation and fill, and grading,site storm water drainage, the installation of concrete curbing, and concrete sidewalks, the installation ofsubbase materials, asphalt, and pavement striping for improvements to the parking lot, the installation of signage, the installation of a dumpster pad and enclosures, and the completion of turf restoration and landscape improvements.

Award

Playgrounds / Parks / Athletic Fields

$1,141,800.00

Public - City

Paving, Site Work

16

18

6

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
285
Active Projects
179
Bidding Soon
2,025
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2025

April 23, 2025

Project location map

499 Fellows Rd, Fairport, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.