Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 1, 2025 at 8:00 PM
Updated April 3, 2025
Site work for a water / sewer project in Washington, Indiana. Completed plans call for site work for a water / sewer project.
** As of April 01, 2025, project was awarded to Layne Christensen Company, awarded amount is $379,821 ** The work tobe performed and the proposal to be submitted, including any and all separate and combinationproposals, shall include sufficient and proper sums for all General, Construction, MechanicalInstallation, Labor, Materials, Tools, Equipment, Taxes (both Federal and State), Permits, Licenses,Service Costs, and so forth incident to and required for the construction of the facilities. All materialsfurnished and labor performed incident to and required Each proposal shall be accompaniedby a certified check or acceptable bidder's bond made payable to the Owner, in a sum of not less thanfive percent (5%) of the total amount of the highest aggregate proposal, which check or bond will beheld by the Owner as evidence that the bidder will, if awarded a contract or contracts, enter into thesame with the Owner upon notification to him to do so within ten (10) days of said notification.' Failureto execute a contract and to furnish a Performance and Payment Bond as hereinafter set out will because for forfeiture to the Owner of the amount of money represented by the certified check orBidder's Bond, as and for liquidated damages. Approved Performance and Payment Bondsguaranteeing faithful and proper performance of the work and materials, to be executed by anacceptable Surety Company, will be required of each Contractor at the time he executes his contract.The Bond will be in the amount of 100% of the Contract Price and must be in full force and effect for aperiod of 12 months from the date of acceptance of and final payment of the work. Proposals shall beproperly and completely executed on proposal forms included in the Specifications. Proposals shallinclude the Indiana State Board of Accounts Form 96 provided and executed by the bidder, all asrequired by Statute. No proposals shall be withdrawn after the opening of the bids without the consentof the Owner for a period of ninety (90) days after the scheduled time of receiving same. The Ownerreserves the right to reject any proposal, or all proposals, or to accept any proposal or proposals, or tomake such combination of proposals as may seem desirable, and to waive any and all informalities inthe bidding.
Award
Water / Sewer
$500,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 24, 2025
April 23, 2025
Multiple Locations, Washington, IN
Related To This Project
Washington, IN
Bid Date: Mar 19 2025
Washington, IN
Bid Date: Apr 09 2025
Washington, IN
Bid Date: Apr 09 2025
Washington, IN
Bid Date: Mar 28 2025
Washington, IN
Bid Date: Apr 28 2025
Washington, IN
Bid Date: May 21 2025
Washington, IN
Bid Date: Jun 05 2025
Washington, IN
Bid Date: Sep 03 2025
Washington, IN
Bid Date: Mar 13 2025
Washington, IN
Bid Date: Feb 26 2025
Washington, IN
Bid Date: Mar 10 2025
Washington, IN
Bid Date: Feb 04 2025
Washington, IN
Bid Date: Jan 27 2025
Washington, IN
Bid Date: Jan 28 2025
Washington, IN
Bid Date: Sep 10 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
