BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 2, 2025 at 7:00 PM

Updated March 3, 2025

Demolition, site work and new construction of an educational facility in Madison, Wisconsin. Conceptual plans call for the demolition of a educational facility; for the construction of a educational facility; and for site work for a educational facility.

This project relocates the remaining occupants (Art and Music Departments) of the dilapidated Mosse Humanities Building into replacement facilities and then demolishes the building and restores the site in preparation for future redevelopment. Project work includes creating a new, unified home for the School of Education's Art Department in a renovated and expanded art facility with a new three-story addition. Spaces that house the creation of three-dimensional art (ceramics, glass and neon, papermaking, printmaking, sculpture, and wood shops) and utilize heavy equipment and/or materials storage will be relocated to the ground floor. The upper floors will house units and spaces that have less intensive equipment and materials storage needs (administrative office, art education, drawing, graphic design, and painting). The single-story and basement triangle wing of the original facility will be demolished. Renovation work in the facility's remaining space includes replacement, repairs, and augmentation to the building's mechanical, electrical, telecommunications, plumbing, and fire protection systems to support the revised facility layout. As of March 3, 2025, The project is include in the State's 2025-2031 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Educational

$207,217,000.00

Public - State/Provincial

Demolition, New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
298
Active Projects
140
Bidding Soon
1,586
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2027

Project location map

500 Lincoln Dr, Madison, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.