Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 12, 2025 at 8:00 PM
Updated March 13, 2025
Site work for a water / sewer project in Vandalia, Missouri. Completed plans call for site work for a water / sewer project.
Painting of 150,000 Gal. Elevated Water Tank The work includes the preparation and painting of the exterior of the existing 150,000- gallon elevated water tank. The work will not begin until May 15, 2025, and must be completed by November 1,2025. A bid bond, cashier's check, or a certified check made payable to the order of City of Vandalia in the amount of five percent (5%) of the gross amount of the bid must be deposited by each bidder with his bid as guarantee that in case the contract is awarded to him, he will, within fifteen (15) days thereafter, upon receipt of written notice of award, execute such contract and furnish a satisfactory performance bond. Upon failure to do so, he shall forfeit the deposit as liquidated damages and acceptance of the bid will be contingent upon the fulfillment of this requirement by the bidder. The checks or bid bonds of all excepting the two (2) lowest formal bidders will be returned within ten (10) days after the bids are opened and read. Checks and bid bonds of the two (2) lowest formal bidders will be returned as soon as the contract and bond of the lowest formal bidder have been properly executed and approved. The successful bidder will be required to agree that not less than the prevailing rate of wages will be paid to all workmen, laborers, and mechanics performing their work under this contract The successful bidder will be required to furnish a performance bond satisfactory to the City of Vandalia in the amount of the contract. The City of Vandalia reserves the right to waive or not to waive any irregularities in the bids and to reject any or all bids and to determine which is the lowest and best bid or combination of bids for the improvements
Post-Bid
Water / Sewer
$150,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 11, 2025
May 15, 2025
W State St & S Oak St, Vandalia, MO
Related To This Project
Vandalia, MO
Bid Date: Nov 21 2025
Vandalia, MO
--
Vandalia, MO
Bid Date: May 16 2024
Vandalia, MO
Bid Date: Nov 02 2023
Vandalia, MO
--
Vandalia, MO
Bid Date: Nov 01 2021
Vandalia, MO
Bid Date: Apr 22 2021
Doss, MO
--
Kingdom City, MO
Bid Date: Mar 04 2025
Kirksville, MO
Bid Date: Mar 18 2025
Republic, MO
Bid Date: Mar 19 2025
Columbia, MO
Bid Date: Mar 28 2025
Sedalia, MO
Bid Date: Apr 01 2025
Saint Louis, MO
Bid Date: Mar 26 2025
Lees Summit, MO
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
