BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 5, 2025 at 7:00 PM

Updated March 26, 2025

Renovation of an educational facility in Ashton, Idaho. Completed plans call for the renovation of a educational facility.

Bid Packages shall consist of multiple individual trade scope packages that will be a subcontract to Bateman-Hall. Fremont County Joint School District 215 has retained Bateman-Hall as a CM/GC, to coordinate the management of the Ashton Elementary School HVAC Upgrade project. Each Subcontractor will be required to cooperate and coordinate with the CM/GC and all other subcontractors to perform their work in accordance with a Master Project Schedule developed, updated, and maintained by the CM/GC. Each Subcontractor will be required to provide specified scheduling information necessary to maintain the Master Project Schedule and to meet the milestone completion dates as identified on the Bid Form and in each Subcontractor Contract. PROJECT SCOPE: Upgrade the electrical and HVAC system. All work shall be performed in accordance with Contract Documents, Plans, Specifications, Department of Public Works Standards, The International Building Code, and as directed by the Fremont County Joint School District 215 Representatives. This Public Works project is not financed in whole or in part by federal funds. Subcontractors shall be licensed in the State of Idaho in accordance with the provisions of the Idaho Public Works Contractors' State License Law. The Owner reserves the right to accept or reject any and all proposals with or without cause, for any reason determined in its sole subjective determination to be in its best interest, and to waive any informality in bidding. Fremont County Joint School District #215 will determine whether to award the Contract within a period not to exceed forty-five (45) days from Bid Opening Date and will notify the Bidders of the determination. All Bidders are expected to honor their proposals for the 45-day review period. Bid bonds will not be required for subcontractors to bid.

Post-Bid

Educational

$500,000.00

Public - County

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
6
Bidding Soon
130
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.