Published March 20, 2025 at 8:00 PM
Updated October 1, 2024
Renovation of a transportation facility in Boston, Massachusetts. Completed plans call for the renovation of a transportation facility.
Electronic Bids for MPA Contract No. L1781 C1 TERMINAL B HVAC REPLACEMENT PROJECT, FANROOMS 10 &12 will be received through the internet using website until the date and time stated below, and will be posted on website immediately after the bid submission deadline. No paper copies of bids will be accepted. The work includes: 1. DEMOLITION AND REMOVAL OF ALL EXISTING AIR HANDLER UNITS LOCATED IN FAN ROOMS 10 AND 12-IN TERMINAL B. DEMOLITION OF EXISTING RELATED MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION SCOPE IN FAN ROOMS 10 AND 12; REMOVAL OF AMERICAN AIRLINE TOWER AHU LOCATED IN FAN ROOM 10. 2. INSTALLATION OF NEW AIR HANDLER UNITS, ENERGY RECOVERY UNITS AND RELATED MECHANICAL, PLUMBING AND ELECTRICAL EQUIPMENT IN FAN ROOMS 10 AND 12. 3. INSTALLATION OF NEW CONTROLS TO CONNECT NEW HVAC EQUIPMENT INSIDE FAN ROOMS WITH FACILITY MANAGEMENT OFFICE. 4. DEMOLITION OF EXISTING REHEATING COILS INSIDE THE SERVICED SPACES LOCATED ON LEVEL 1 AND LEVEL 2 OF TERMINAL B AND INSTALLATION OF NEW VAV BOXES AT SELECTED LOCATIONS In order to be eligible and responsible to bid on this contract General Bidders must submit with their bid a current Certificate of Eligibility issued by the Division of Capital Asset Management and an Update Statement. The General Bidder must be certified in the category of GENERAL CONTRACTOR the estimated contract cost is $ 17,500,000. In order to be eligible and responsible to bid on this contract, filed Sub-bidders must submit with their bid a current Sub-bidder Certificate of Eligibility issued by the Division of Capital Asset Management and an Update Statement. The filed Sub-bidder must be certified in the sub-bid category of work for which the Sub-bidder is submitting a bid proposal. Bidding procedures and award of the contract and sub-contracts shall be in accordance with the provisions of Sections 44A through 44H inclusive, Chapter 149 of the General Laws of the Commonwealth of Massachusetts. A proposal guaranty shall be submitted with each General Bid consisting of a bid deposit for five (5) percent of the value of the bid; when sub-bids are required, each must be accompanied by a deposit equal to five (5) percent of the sub-bid amount in the form of a bid bond in the name of which the Contract for the work is to be executed. The bid deposit shall be (a) in a form satisfactory to the Authority, (b) with a surety company qualified to do business in the Commonwealth and satisfactory to the Authority, and (c) conditioned upon the faithful performance by the principal of the agreements contained in the bid. Bidders must submit a Buy American Certificate with all bids or offers on AIP funded projects. Bids that are not accompanied by a completed Buy American Certificate must be rejected as nonresponsive. The successful Bidder will be required to furnish a performance bond and a labor and materials payment bond, each in an amount equal to 100% of the Contract price. The surety shall be a surety company or securities satisfactory to the Authority. Attention is called to the minimum rate of wages to be paid on the work as determined under the provisions of Chapter 149, Massachusetts General Laws, Section 26 to 27G, inclusive, as amended. The Contractor will be required to pay minimum wages in accordance with the schedules listed in Division II, Special Provisions of the Specifications, which wage rates have been predetermined by the U. S. Secretary of Labor and /or the Commissioner of Labor and Industries of Massachusetts, whichever is greater. The successful Bidder will be required to purchase and maintain Bodily Injury Liability Insurance and Property Damage Liability Insurance for a combined single limit of $30,000,000. Said policy shall be on an occurrence basis and the Authority shall be included as an Additional Insured. See the insurance sections of Division I, General Requirements and Division II, Special Provisions for complete details. The Authority reserves the right to reject any sub-bid of any sub-trade where permitted by Section 44E of the above-referenced General Laws. The right is also reserved to waive any informality in or to reject any or all proposals and General Bids. This contract is subject to a Disadvantaged Business Enterprise participation provision requiring that not less than ZERO(0)% of the Contract be performed by disadvantaged business enterprise contractors. With respect to this provision, bidders are urged to familiarize themselves thoroughly with the Bidding Documents. Strict compliance with the pertinent procedures will be required for a bidder to be deemed responsive and eligible. This Contract is also subject to Affirmative Action requirements of the Massachusetts Port Authority contained in the Non-Discrimination and Affirmative Action article of Division I, General Requirements and Covenants, and to the Secretary of Labor's Requirement for Affirmative Action to Ensure Equal Opportunity and the Standard Federal Equal Opportunity Construction Contract Specifications (Executive Order 11246). The Authority, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 USC 2000d to 2000d-4) and the Regulations, hereby notifies all bidders or offerors that it will affirmatively ensure that for any contract entered into pursuant to this advertisement, all bidders/proposers will be afforded full and fair opportunity to submit bids in response to this invitation and no businesses will be discriminated against on the grounds of race, color, national origin (including limited English proficiency), creed, sex (including sexual orientation and gender identity), age, or disability in consideration for an award. The General Contractor is required to submit a Certification of Non-Segregated Facilities prior to award of the Contract, and to notify prospective subcontractors of the requirement for such certification where the subcontract exceeds $10,000. A Contractor having fifty (50) or more employees and his subcontractors having fifty (50) or more employees who may be awarded a subcontract of $50,000 or more will, within one hundred twenty (120) days from the contract commencement, be required to develop a written affirmative action compliance program for each of its establishments. Compliance Reports - Within thirty (30) days of the award of this Contract the Contractor shall file a compliance report (Standard Form [SF 100]) if: (a) The Contractor has not submitted a complete compliance report within twelve (12) months preceding the date of award, and (b) The Contractor is within the definition of "employer" in Paragraph 2c(3) of the instructions included in SF100. The contractor shall require the subcontractor on any first tier subcontracts, irrespective of the dollar amount, to file SF 100 within thirty (30) days after the award of the subcontracts, if the above two conditions apply. SF 100 will be furnished upon request. SF 100 is normally furnished Contractors annually, based on a mailing list currently maintained by the Joint Reporting Committee. In the event a contractor has not received the form, he may obtain it by writing to the following address: Joint Reporting Committee 1800 G Street Washington, DC 20506 Complete information and authorization to view the site may be obtained from the Capital Programs Department Office at the Massachusetts Port Authority. The right is reserved to waive any informality in or reject any or all proposals.
GC Bidding
Transportation Terminals
$17,500,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 03 - Concrete
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 11 - Equipment
Division 12 - Furnishings
Division 14 - Conveying Equipment
Division 21 - Fire Suppression
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 25 - Integrated Automation
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 2, 2025
June 2, 2025
To Be Determined, Boston, MA
Related To This Project
Boston, MA
Bid Date: Mar 18 2025
Boston, MA
Bid Date: Apr 28 2025
Boston, MA
Bid Date: Mar 31 2025
Boston, MA
Bid Date: Mar 05 2025
Boston, MA
Bid Date: Apr 11 2025
Boston, MA
Bid Date: Apr 08 2025
Boston, MA
Bid Date: Apr 07 2025
Boston, MA
Bid Date: Apr 07 2025
Boston, MA
--
Boston, MA
Bid Date: Apr 03 2025
Boston, MA
--
Boston, MA
Bid Date: Mar 20 2025
Boston, MA
--
Boston, MA
Bid Date: Mar 27 2025
Boston, MA
Bid Date: Mar 12 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
Terminal B Hvac Replacement Project, Fanrooms 10 &12 Logan International Airport - General
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.