Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 13, 2025 at 7:00 PM
Updated December 14, 2025
Site work and paving for a road / highway in Troy, Alabama. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The work under this Section covers the general requirements that are applicable to all types of hot and warm mix asphalt pavements of the plant mix type. Deviations from these general requirements will be indicated in the specific requirements for various types of mixes noted in the following sections of these Specifications. This work shall consist of one or more courses of hot and warm mix asphalt plant mix constructed in accordance with these specifications and the specific requirements of the type of mixture required and in reasonably close conformity with the lines, grades, thicknesses, and typical cross sections shown on the plans or established by the Engineer. The Contractor may use either hot mix or warm mix for all Superpave ESAL Range mixes in Sections 420, 423, and 424. Warm mix asphalt shall be defined as the use of an approved warm mix technology in the plant mix at the time of production. Call # 010 Pike County Contract Time: 140 Working Days DBE Goal Percent:4.00 for constructing the Planing, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-10 (US-231) from the intersection of SR-15 (US-29) to the junction of Diamond Drive in Troy. Length 3.510 mi. The Bracket Estimate on this project is from $2,879,513 to $3,519,405 . If further clarification is needed, please contact the Plans and Proposals Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 010 - Planing, Resurfacing, Guardrail Installation, and Traffic Stripe on SR-10 (US-231) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Roads / Highways
$2,833,185.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 28, 2025
July 14, 2025
US-231, Troy, AL
Related To This Project
Troy, AL
Bid Date: Mar 25 2025
Troy, AL
Bid Date: Apr 02 2025
Troy, AL
Bid Date: Apr 08 2025
Troy, AL
Bid Date: Apr 08 2025
Troy, AL
Bid Date: Mar 31 2025
Troy, AL
Bid Date: Apr 16 2025
Troy, AL
Bid Date: Mar 11 2021
Troy, AL
Bid Date: Feb 25 2025
Troy, AL
Bid Date: Jan 30 2025
Troy, AL
Bid Date: Jan 16 2025
Troy, AL
Bid Date: Dec 19 2024
Troy, AL
Bid Date: Nov 13 2024
Troy, AL
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
