EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 21, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Champaign, Illinois. Completed plans call for the renovation of a educational facility; and laboratory facility.

The State of Illinois, Capital Development Board (CDB) will receive sealed bids for: CDB PROJECT #: 830-010-351 Phase 1 TITLE: Multiple Building Life Safety Upgrades: Fire Alarm Replacement LOCATION: Talbot Laboratory & Krannert Center for the Performing Arts USING AGENCY: University of Illinois - Urbana Champaign COUNTY: Champaign County, Illinois PROJECT DESCRIPTION: The scope of work includes life safety upgrades to be installed in Talbot Laboratory and Krannert Center for the Performing Arts under Alternate Bid 1. The scope of work in Talbot Laboratory consists of installation of a new automatic fire suppression system, installation of new fire pump to serve the fire suppression system, replacement of older fire alarm notification and sensor devices, and addition of new devices to ensure proper coverage. The scope of work in the Krannert Center for the Performing Arts includes replacement of the fire alarm panel and devices throughout the building. Work in Talbot Laboratory shall be bid as Base Bid work, and work in Krannert Center for the Performing Arts shall be bid as Alternate Bid 1. Single Prime Delivery Method: Either the Single Prime Bidder or a protected subcontractor must be listed for each trade provided on the Bid Form. Only one protected subcontractor may be listed for each trade. Failure to identify the name and bid proposal cost of each listed protected subcontractor on the provided Bid Form or providing more than one protected subcontractor for each trade will be a material deficiency (no time will be allowed after bid opening to remedy deficiency) and will result in the rejection of the bid. All protected subcontractors listed must be prequalified with CDB in accordance with CDB Standard Documents for Construction, Article 00 21 05.* *Please Note: A deficiency related to the failure of a listed, protected subcontractor to be prequalified with CDB will be considered a technical deficiency, as opposed to a material deficiency. A bidder will be allowed to cure such deficiency within seven calendar days of notice by selecting a protected subcontractor that is properly prequalified with CDB, licensed and certified, to perform the identified trade. A decision by the bidder to utilize a different protected subcontractor than that originally listed, shall not affect bid price. TRADE COST RANGE ELECTRICAL under $2,000,000 TO SUBMIT BIDS VIA e-BUILDER: o Click the URL on CDB's Bid Information webpage for the specific project for which you wish to submit a bid. A separate URL will be included with each bid opportunity. o Log into the e-Builder Bid Portal. If you have not previously used the Bid Portal, you may create an account by clicking the "Create Account" button on the login page and entering the required information. o For Step 1 Bid Form, vendors should enter bid amounts, including any alternates. o For Step 2 Response Documents, which is the second tab in the middle of the screen, vendors should upload required documents as a PDF. These documents include the 00 41 00 - Bid Form, 00 41 01 - Subcontractor Requirements, 00 41 04 - PC-2 Form, 00 41 05 - MBE WBE PBE VBE Program Requirements, 00 41 06 - Bid Bond, 00 41 08 - Standard Terms and Conditions, and 00 41 09 - Certifications and Disclosures. o For Step 3 Additional Information, the vendor must enter data about its organization, i.e. IPG Number, contact name. o After clicking Submit, an email will be sent to the sender's email address to confirm receipt of the bidding documents. o It is the vendor's responsibility to ensure that its bid and all required documentation are attached in the portal. o For additional assistance related to the e-Builder system, email CDB.eBuilderSupport@illinois.gov. Questions submitted through the e-Builder module will not reviewed or responded to. In the event that the bidder experiences technical errors uploading and submitting its bid or bid modification into the system, the bidder must submit a screenshot of the error it receives to CDB.CPO@illinois.gov prior to the bidding deadline. Once the error has been submitted, a vendor will be provided detailed instructions on submitting its bid or bid modification via an alternative file transfer system. CDB will evaluate the information provided in the email and, in consultation with the CPO's office, determine if the bid should be accepted or rejected. BID MODIFICATIONS: Modifications to bids submitted through the e-Builder portal shall be made in the portal at any time prior to the bidding deadline by logging into the e-Builder system, recalling the previously submitted bid, and submitting the revised bid amounts. In the event that the bidder experiences technical errors when making a modification to its bid in the e-Builder portal, the bidder must submit a screenshot of the error to CDB.CPO@illinois.gov prior to the bidding deadline. Once the error has been submitted, a vendor will be provided detailed instructions on submitting its bid or bid modification via an alternative file transfer system. CDB will evaluate the information provided in the email and, in consultation with the CPO's office, determine if the bid should be accepted or rejected. BID OPENING: When it's time, join your WebEx meeting here. Meeting website: https://illinois.webex.com/illinois/j.phpMTID=m4d22e31e0f16501e3044f04440d9a15e Meeting number (access code): 2632 410 5214 Meeting password: scHmkHWm634 Join by phone +1-312-535-8110 United States Toll (Chicago) +1-415-655-0002 US Toll Meeting participants will not be able to ask questions either verbally or via the meeting's chat feature. Minority, Women, Persons with Disabilities, and Veteran Business Subcontractor/Supplier Participation is Applicable.

Sub-Bidding

Educational

$2,000,000.00

Public - State/Provincial

Renovation

59

16

12

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Starting and Adjusting, Closeout Submittals, Maintenance Data, Warranties, Project Record Documents, Commissioning, General Commissioning Requirements, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, Instrumentation and Control for HVAC, Instrumentation and Control Devices for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Hangers and Supports for Electrical Systems, Overcurrent Protective Device Coordination Study, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Switchboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Batteries, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
52
Bidding Soon
504
All Active Projects
288
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2025

August 12, 2025

img_map_placeholder

Multiple Locations, Champaign, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Multiple Building Life Safety Upgrades: Fire Alarm Replacement - Phase 1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.