Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 12, 2025 at 8:00 PM
Updated March 13, 2025
This is a service / maintenance or supply contract in Houston, Texas. Contact the soliciting agency for additional information.
The Scope of Work (SOW) for the Project is to provide project management, alternatives analysis, preliminary engineering, diagrammatic layout development, and environmental documentation for the widening of the existing South Lake Houston Parkway from Beltway 8 to Aqueduct Road and the extension of the facility from Aqueduct Road to Foley Road and Diamond Head Boulevard. The Project shall examine the overall corridor and complete a route and design study to identify the best alignment and overall connection points between Beltway 8 and the transportation network on the southeast side of Lake Houston. The current alignment and cross-sections are planning concepts and should be further evaluated for feasibility and cost effectiveness. The route and design study should be integrated into the environmental process to allow for consistency with the NEPA process. Following the route and design study, the project will be designed with a diagrammatic layout to be used for future PS&E development. The diagrammatic layout is intended to be similar to schematic design for an off-system roadway. The Project is funded by federal transportation funding. As such, the Project is subject to the requirements of federally funded transportation projects. The design will be locally managed by the District with TxDOT reviewing and approving the preliminary engineering and environmental package. The Prime Consultant will be responsible for the management of the project, including the performance of all sub-consultants to accomplish the delivery of all documents and services. All inquiries must be made prior to 5:00 PM on March 14, 2025. Any inquiries regarding the project or RFQ must be submitted through online.
Conceptual
Roads / Highways
Public - County
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
1
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 29, 2025
S Lake Houston Pkwy, Houston, TX
Related To This Project
Houston, TX
--
Houston, TX
Bid Date: Mar 18 2025
Houston, TX
--
Houston, TX
Bid Date: Jun 24 2025
Houston, TX
Bid Date: Apr 02 2025
Houston, TX
Bid Date: Mar 14 2025
Houston, TX
Bid Date: Apr 03 2025
Houston, TX
Bid Date: Apr 21 2025
Houston, TX
Bid Date: Apr 08 2025
Houston, TX
Bid Date: Mar 25 2025
Houston, TX
--
Houston, TX
Bid Date: Mar 27 2025
Houston, TX
Bid Date: Jun 26 2025
Houston, TX
Bid Date: Mar 28 2025
Houston, TX
Bid Date: Mar 26 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
