Published March 24, 2025 at 8:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Cranbury, New Jersey. Completed plans call for the renovation of a 775-square-foot, two-story above grade educational facility.

The scope of the project includes, but is not limited to, the removal of six existing gas fired boilers and the installation of three new gas fire boilers of greater capacity, replacement of the existing hot water pumps, a new flue design as well as combustion air intake for the sealed combustion boilers and a control panel with the option to tie-in to the school’s existing Building Management System. Bids must be accompanied by bid security in the form of (1) a bid bond or certified or cashier's check payable to the Cranbury Township Board of Education equal to 10% of the amount of the bid, but in no case to exceed $20,000.00 per, and (2) Certificate of Consent of Surety per N.J.S.A. 18A:18A-25. The successful bidder will be required to furnish additional bonds as specified in Document 00 21 13, "Instructions to Bidders." The Board of Education reserves the right to reject any non-responsive bids or all bids pursuant to N.J.S.A. 18A:18A-22 and to waive minor informalities or non-material exceptions, that may be in the best interest of the Board. No bid may be withdrawn for a period of sixty (60) days after the opening date. Questions will be considered only up until the inquiry deadline stated in the Instructions to Bidders. The scope of this project includes, but is not limited to, the removal of six existing gas fired boilers and the installation of three new gas fired boilers of greater capacity, replacement of the existing hot water pumps, a new flue design as well as combustion air intake for the sealed combustion boilers and a control panel with the option to tie-in to the school's existing Building Management System. The Contract Documents define the full project scope. Bids will be received from a Bidder for a lump sum price for the entire project, all trades, all inclusive. Bidders must be pre-qualified by the New Jersey Department of Treasury, Division of Property Management and Construction (DPMC) in one of the following categories, pursuant to (C032) HVACR or (C033) BOILERS Bidders shall also either be prequalified for, or include documentation for prequalified subcontractors for, the following listed classifications: (C030) PLUMBING (C047) ELECTRICAL Bidders and subcontractors for each of the major branches of work specified in N.J.S.A. WORK IDENTIFIED IN CONTRACT DOCUMENTS A. The Scope of Work for the Project is determined by the complete construction documentation, including all addenda thereto issued during the bid cycle, and the full Scope of Work is not limited by the brief summary of the Work provided here or in the Division 01 Summary of Work section, and including any Summary of Site Work section for projects involving exterior site improvements. Such “summaries” are issued to provide Bidders with a basic understanding of the general intent of the Project, and as such, the summaries are not exhaustive, all-inclusive listings of project scope. Absence of any specific detail in an offered summary does not remove such element from the Scope of Work presented by the complete document set

Sub-Bidding

Educational

$330,000.00

Public - City

Renovation

17

16

2

6

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Quantity Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Brick Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Wet-Pipe Sprinkler Systems
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central Heating Equipment, Heating Boilers, Condensing Boilers, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Instrumentation and Control for Electrical Systems, Low-Voltage Electrical Distribution, Facility Electrical Power Generating and Storing Equipment
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Communications Utilities, Communications Distribution
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
537
Active Projects
310
Bidding Soon
4,906
All Active Projects
2,328
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2025

June 19, 2025

img_map_placeholder

23 N Main St, Cranbury, NJ

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Boiler Replacement at Cranbury School

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.