Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 4, 2025 at 8:00 PM
Updated October 1, 2024
Site work and paving for a civil project in Pueblo, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The Contractor shall furnish all labor, equipment, material, supplies, signage, traffic control, and other incidentals necessary to provide a Slurry Seal. A 5% Bid Bond must accompany each bid received. Security shall be either a Certified Check, Cashier's Check, or Bid Bond. A Bid Bond shall be written on the County form, if provided, and the attorney in fact who executes the bond on behalf of surety shall affix to the bond a certified and current copy of his/her power of attorney. If the amount of the contract price is in excess of fifty thousand dollars ($50,000.00), for the construction, erection, repair, maintenance, or improvement of any building, road, bridge, viaduct, tunnel, excavation, or other such public work included in said contract, the Contractor before entering upon the performance of any such work included in the contract, shall duly execute, deliver to and file with the Purchasing Manager or designee a good and sufficient bond, or other acceptable surety, approved by the Purchasing Manager or designee, in the penal sum not less than one-half of the total amount payable under the terms of the contract. Addenda will be mailed or delivered to each person or firm recorded by Pueblo County Purchasing, 215 W. 10th Street, Room 14, Pueblo, CO 81003 to have received complete sets of the Bidding Documents and copies will be available for inspection wherever Bidding Documents are on file for that purpose. No Addenda will be issued later than Five (05) working days prior to the date for receipt of bids, except an Addendum, if necessary, to postpone the date for receipt of bids or for withdrawing the request for bids. Pueblo County reserves the right to accept or reject any or all bids, and waive any irregularities or informalities. Due to the nature of applying slurry seal over a chip seal surface, additional slurry material may be required to adequately fill the voids in the chip seal layer and achieve a uniform surface. Bidders shall consider this when determining application rates and material quantities for slurry seal in their proposals. Layer Curing Time: A Minimum curing and waiting period of 72 hours shall be observed between the completion of the chip seal and the application of the slurry seal. This is to ensure proper curing of the chip seal, adequate chip embedment, and to allow for necessary sweeping and surface preparation before slurry placement
Award
Roads / Highways
$1,439,886.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 10 - Specialties
Division 31 - Earthwork
Division 32 - Exterior Improvements
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 25, 2025
April 15, 2025
Multiple Locations, Pueblo, CO
Related To This Project
Pueblo, CO
Bid Date: Mar 20 2025
Pueblo, CO
Bid Date: Apr 03 2025
Pueblo, CO
Bid Date: Mar 25 2025
Pueblo, CO
Bid Date: Mar 25 2025
Pueblo, CO
Bid Date: Apr 02 2025
Pueblo, CO
Bid Date: Apr 08 2025
Pueblo, CO
Bid Date: Mar 25 2025
Pueblo, CO
--
Pueblo, CO
Bid Date: Mar 25 2025
Pueblo, CO
Bid Date: Mar 12 2025
Pueblo, CO
Bid Date: Mar 27 2025
Pueblo, CO
Bid Date: Apr 03 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.