BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 5, 2025 at 8:00 PM

Updated May 6, 2025

Site work and new construction of a transportation facility in Ocala, Florida. Conceptual plans call for the construction of a transportation facility; and for site work for a transportation facility.

(a) The objective of this ITN is to identify and engage a master developer or other qualified firm (hereinafter referred to as the “Developer”) capable and willing to fund, design, develop, and operate a facility or enterprise that will serve or support operations at OIA in compliance with FAA policies and OIA standards. (c) The City intends to enter into time-limited negotiations with the Developer culminating into a Lease and Development Agreement (“Development Agreement”) securing the long-term lease of the subject property and addressing the parties’ rights and obligations with respect to the development of the subject City-owned property. (d) The document attached to this ITN as EXHIBIT E is a Sample Ground Lease and Development Agreement. Proposers shall include with their submission a detailed list of any exceptions to the terms and conditions set forth therein. The City reserves the right to accept or reject any or all exceptions at its sole discretion. (a) Must be legally qualified and properly certified to engage in contracting through a certified or registered general contractor or a certified or registered building contractor as the qualifying agent, and qualified to perform the services proposed in response to this ITN under any other applicable laws or regulations. (b) Must demonstrate and clearly show in their written proposals that they meet the minimum standards of competency and experience to provide the services outlined in this ITN. (c) Must have, and be able to demonstrate, adequate technical resources, financial resources and equipment, or have the ability to obtain and to manage such resources and equipment, as required during the performance period of the proposed contract. (d) Must be able to comply with the proposed or required performance schedule. (e) Must have a satisfactory record of contractual performance. QA date 5/5/2025 @ 5:00 PM EST

Conceptual

Transportation Terminals

$2,000,000.00

Public - City

New Construction, Site Work

4

7

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
303
Active Projects
149
Bidding Soon
2,186
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.