Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 29, 2025 at 8:00 PM
Updated March 30, 2025
Site work and paving for a road / highway in Cahone, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Reference Number 0000378731 Delivery Point: Telluride, CO Bid Intent Not Available Question Deadline 03/21/2025 at 12:00 PM MT Questions are submitted online No The WORK includes asphalt milling between 1-inch and 1.5-inch, and furnishing of asphalt overlay with the use of a Paving machine and overlaid between 2-inch and 2.5-inch thickness as described in the Bid Form and Plan Sheets. Asphalt quantities are approximately 1,675 TONS of HMA as specified in the contract documents. The Town of Telluride reserves the right to reject any or all Proposals, in part or in whole, or to waive any informalities or technicalities in this Request for Proposal if it is deemed to be in the best interest of the Town to do so. Summary of Work The Contract Documents provide for construction of Telluride's 2025 Street Mill & Overlay Program. The WORK includes milling, patching, and paving, as described below. A submittal of hot asphalt mix (HMA) and Class 6 road base is required prior to start of work pursuant to Town and Project specifications. A Pre-Construction Meeting is required before primary mobilization, and 48-hour notice is required prior to mobilization to other work areas. Please see the Bid Tab for an itemization of work to be performed. Schedule limitations are noted in the Project plan sheets. Final Completion date for overall project is December 1, 2025 (weather permitting). o Work Item #1: Prospect Ave & Smuggler Ave (Mahoney Dr to END) o Work Item #2: E. Pacific Ave (Willow to END) o Work Item #3: Townsend St (Columbia Ave to Colorado), inclusive of Townsend St. and Columbia Ave. intersection o Work Item #4 Pine St (Galena Ave to Columbia Ave) o Work Item #5 E. Colorado Ave (Pine St. to Willow St.) o Work Item #6 E. Colorado Ave (Maple St to Pinon St) o Work Item #7 E. Colorado Ave (Pinon St to Columbine St) o Work Item #8 E. Columbine St. to Liberty Bell Ln, inclusive of Bus Turn-Around @ Gold Run o Add Alternate - Open Cut Sewer Repair at 200 Block - Willow St.
Post-Bid
Roads / Highways
$600,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 26, 2025
April 25, 2025
Multiple Locations, Cahone, CO
Related To This Project
Cahone, CO
Bid Date: Mar 21 2025
Cahone, CO
Bid Date: May 23 2025
Cahone, CO
--
Cahone, CO
Bid Date: Feb 28 2025
Cahone, CO
Bid Date: Mar 18 2025
Cahone, CO
Bid Date: Sep 06 2024
Cahone, CO
Bid Date: Nov 09 2023
Cahone, CO
Bid Date: Mar 07 2022
Cahone, CO
Bid Date: Feb 17 2023
Colorado Springs, CO
Bid Date: Apr 01 2025
Colorado Springs, CO
Bid Date: Mar 25 2025
Arvada, CO
--
Glenwood Springs, CO
Bid Date: Apr 03 2025
Lakewood, CO
Bid Date: Mar 25 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
