BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 7, 2025 at 8:00 PM

Updated April 8, 2025

Renovation of an educational facility in Cedar Rapids, Iowa. Completed plans call for the renovation of a 1,950-square-foot educational facility.

The Operations Department of the Cedar Rapids Community School District requests your proposal for goods and/or services. for the abatement of flooring mastic, and base in selected classrooms at McKinley MS as requested by the Cedar Rapids Community School District. Bids will be evaluated promptly after opening. After an award is made, a bid tabulation summary will be sent to all companies who submitted a bid. Bid results will not be given over the telephone or prior to award. Bids may be withdrawn any time prior to the scheduled closing time for receipt of bids. Do not include Federal or State Tax in costs submitted. The Operations Department and/or Board of Directors reserve the right to reject any and all proposals or any part thereof, and to waive informalities and to enter into such contracts or contracts as shall be deemed in the best interest of the Cedar Rapids Community School District, in the County of Linn, State of Iowa. No emailed or faxed responses will be accepted This project includes the abatement of flooring, mastic, and base in selected classrooms and offices at McKinley Middle School as specified in the project manual. SCOPE OF WORK All work is to conform to the attached specifications. Contractor shall verify measurements and quantities provided with this scope of work, all quantities provided are approximate. Base bid should include the following abatement of approximately 1,950 SF of VCT, mastic, and underlayment as shown in GREEN on the attached floor plan: o Classroom 106 - 850 SF o Classroom 107 - 1,100 SF Alternate bid #1 should include the following abatement of approximately 1,295 SF of VCT, mastic, and underlayment as shown in GREEN on the attached floor plan: o Classroom 315 - 390 SF o Classroom 318 - 905 SF Remove underlayment in specified areas, flooring system beneath (tongue and groove wood flooring) to remain Remove vinyl base in locations where flooring is abated. File all necessary permits and maintain records in accordance with DNR abatement requirements. Coordinate with Hawkeye Environmental related to permits, abatement plans, clearances, etc. Protect school property from damage. Any damage by the contractor shall be reported to the project manager and repairs shall be made immediately at the contractor's expense. Perform necessary cleaning at the end of each day (per abatement plan) to ensure a clean and safe work area. Contractors may schedule a pre bid meeting with the Construction Project Specialist prior to bidding the project Abatement can be performed between June 5, 2025 and June 30, 2025. All clearances and clean up should be complete by June 30. Cedar Rapids Community School District has moved to electronic bidding through IonWave

Award

Educational

$11,470.00

Public - City

Renovation

5

3

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
211
Active Projects
129
Bidding Soon
784
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2025

June 5, 2025

Project location map

620 10th St SE, Cedar Rapids, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.