Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 20, 2025 at 8:00 PM
Updated May 21, 2025
Site work and renovation of a bridge / tunnel in Hubbardston, Massachusetts. Completed plans call for the renovation of a bridge / tunnel; and for site work for a bridge / tunnel.
The U.S. Army Corps of Engineers - New England District is issuing a Solicitation Notice for Bridge Painting and Concrete Repairs, Barre Falls Dam, Hubbardston, MA. THE WORK CONSISTS OF: Contractor shall provide all labor, materials, equipment, and transportation to paint the spillway bridge and perform concrete repairs at Barre Falls Dam, Hubbardston, MA. Work shall include cleaning, preparation, and painting of the steel end frames, bearings, and ends of the girders of the spillway bridge. Existing paint on these items contains lead as confirmed by sampling and testing of the existing paint performed in November 2024. In addition to painting, the work also includes replacement of the existing expansion joint sealants. Option task items include repair of concrete spalling at the locations shown on the contract drawings. The Government anticipates that fall protection will be required for this project. The magnitude of construction is between $100,000 and $250,000. For additional information on construction contracts awarded to small businesses please visit: Partnering With Us (army.mil). This procurement is set-aside for small business vendors. The applicable NAICS code is 238320 with a Small Business Size Standard of $19 Million. ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE. Questions regarding the solicitation shall be directed to the Contract Specialist: a. Name: Alicia LaCrosse b. Phone: 978-318-8902 c. Email: Alicia.N.LaCrosse@usace.army.mil *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Bridges / Tunnels
$83,320.00
Public - Federal
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 14, 2025
May 14, 2025
To Be Determined, Hubbardston, MA
Related To This Project
Hubbardston, MA
Bid Date: Apr 16 2025
Hubbardston, MA
Bid Date: Jun 24 2025
Hubbardston, MA
Bid Date: Jul 29 2025
Hubbardston, MA
Bid Date: Aug 18 2025
Hubbardston, MA
Bid Date: Jan 09 2025
Hubbardston, MA
Bid Date: Jan 09 2025
Hubbardston, MA
--
Hubbardston, MA
Bid Date: Aug 14 2024
Hubbardston, MA
Bid Date: Aug 14 2024
Hubbardston, MA
Bid Date: Aug 14 2024
Hubbardston, MA
Bid Date: May 14 2024
Hubbardston, MA
Bid Date: Apr 03 2024
Hubbardston, MA
Bid Date: Dec 21 2023
Hubbardston, MA
Bid Date: Mar 02 2022
Hubbardston, MA
Bid Date: Aug 09 2023
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
