EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 24, 2025 at 8:00 PM

Updated October 1, 2024

This is a service / maintenance or supply contract in Birmingham, Alabama. Contact the soliciting agency for additional information.

The Birmingham Airport Authority ("BAA" or "Authority") is requesting proposals (RFP) to remove and install an Uninterruptible Power Supply for a new TSA Checkpoint at the Birmingham-Shuttlesworth International Airport located at 5900 Messer Airport Highway, Birmingham, AL The term of the agreement resulting from this RFP shall be one year. All questions must be submitted in writing and directed to the Birmingham Airport Authority (BAA) Department of Purchasing at eseoane@flybhm.com to be considered. Deadline for Proposal Questions/Clarifications March 17, 2025 2:00 P.M. BAA reserves the right (a) to reject any or all Proposals or any part thereof; (b) to waive any irregularities and/or technicalities on the Proposals; (c) to accept the Proposal that is in the best interest of BAA; (d) to obtain clarification or additional information for any Proposal; (e) to reject any Contractor who has previously failed to perform properly or complete on time any services for BAA; and (f) to reject any Contractor whom investigation shows is not in a position to perform the services as specified in this RFP. The BAA encourages all certified Minority Businesses (MBE) and Women Owned Businesses (WBE) to participate. BAA has an MBE/WBE participation goal for the scope of work associated with this RFP of 3% MBE/WBE or a 6% SBE.

Post-Bid

Transportation Terminals

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
37
Bidding Soon
545
All Active Projects
297
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2025

April 23, 2025

img_map_placeholder

5900 Messer Airport Hwy, Birmingham, AL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Removal and Installation of Uninterruptible Power Supply for TSA Checkpoint

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.