BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 30, 2025 at 8:00 PM

Updated May 31, 2025

Site work for a water / sewer project in Apex, North Carolina. Completed plans call for site work for a water / sewer project.

1) Project consists of furnishing Alum Residuals Removal and Disposal Service, including licenses, permitting, labor, equipment, parts, materials, testing or other incidental work for one time removal of accumulated alum residuals from an existing water treatment plant lagoon at the Chatham County Water Treatment Plant. The services shall include removal, dewatering and disposal of alum residuals to a permitted disposal site according to the North Carolina Division of Water Resources and Division of Waste Management rules and regulations. 2) Provide all labor, materials, equipment, tools, services and incidentals necessary to complete all work required and specified herein. 3) Complete the work, in place, tested and ready for continuous service. Perform or provide repairs, replacements and restoration required as a result of damages resulting from construction operations. 4) Furnish and install all materials, equipment and incidentals, which are reasonably and properly inferable and necessary for the proper completion of the work, whether specifically indicated herein or not The Contractor shall commence the work required within ten calendar days after the date of the Notice to Proceed. Contractor shall be continuously mobilized on site and work shall be complete and ready for payment within 90 calendar days, unless the period for completion is extended otherwise by Chatham County. This project has been approved by our Board for fiscal year FY24-25 and must be fully completed prior to June 30,2025. LOCATION Chatham County Water Treatment Plant 290 Beaver Creek Road Apex, NC 27502 All written inquiries must be submitted in writing by 5:00 pm on Tuesday, March 11 , 2025. It shall be the responsibility of each proposing organization or individual to verify that every addendum has been received prior to submittal. If a proposing vendor finds discrepancies in or omissions from the specifications or should require additional clarification of any part, a written request for interpretation shall be submitted to Michele Peluso. Any interpretation of or changes made to the RFP will be made by written addendum to each proposing consultant and shall become part of the request for any contract awarded. The County will not be responsible for the accuracy of any other oral explanations, interpretations, or representations. Chatham County reserves the right to reject any and all submittals or any part thereof and to select the most responsive submittal that is deemed in the best interest of Chatham County.

Post-Bid

Water / Sewer

$185,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2025

April 24, 2025

Project location map

290 Beaver Creek Rd, Apex, NC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.