Published March 21, 2025 at 8:00 PM

Updated October 1, 2024

Site work and renovation of a civil project in Battle Creek, Michigan. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Contractor shall furnish and perform all Work necessary for the I&E Building Improvements including but not limited to: removal of the existing sludge pumps and installation of the new sludge pumps, piping and valve improvements, building improvements including brick crack repair and lintel repair, concrete stair landing replacement, HVAC improvements, electrical improvements, floor door removal and replacement, and painting, as scheduled, shown on the Drawings and specified, in conformance with the Specifications. 1. This item shall include but not be limited to the following removals: removal of existing sludge pumps; removal of existing piping and valves; removal of existing conduit, wire, disconnects, control panel wiring, and programming; removal of HVAC ventilation; removal of floor door; removal of concrete stair landing. 2. This item shall include but not be limited to the following improvements: installation of pumping equipment, piping, valves, electrical equipment, HVAC equipment and duct, crack repair, lintel repair, installation of floor door, electrical equipment, conduit, wiring, and control panels and painting, as shown on the drawings and or specified. Headworks Improvements - The Contractor shall furnish and perform all Work necessary for the removal of the existing barscreen and installation of the new barscreen including control panel, rehabilitation of existing influent piping (CIPP), lining of influent chambers and bar screen channel, installation of sample pump and associated piping, and installation of washer/compacter discharge chute and associated plant water piping, electrical equipment, conduit, wiring, and control panels as scheduled, shown on the Drawings and specified, in conformance with the Specifications. TECHNICAL QUESTIONS OR SITE VISITATION: Tyler Kindle, 269-353-9650, TKindle@jheng.com BID BOND: Each bid must be accompanied by a standard form bid bond, made payable to the City of Battle Creek, in an amount of not less than five (5%) percent of the base bid submitted. Failure of any accepted bidder to enter into a contract for the work will cause forfeit of the bid security. Certified Checks are not accepted as bid security PERFORMANCE/LABOR/MATERIALS BONDS: The accepted bidder will be required to furnish a satisfactory performance bond and labor/materials payment bond, each in an amount equal to 100% of the contract and insurance certificate upon forms acceptable to the City. Bids may be withdrawn up to the time and date of the bid opening. After the bid opening, bids may not be withdrawn for a period of ninety (90) days thereafter. The City of Battle Creek reserves the right to waive any irregularity or informality in bids, to reject any and/or all bids, in whole or in part, or to award any contract to other than the low bidder, should it be deemed in its best interest to do so Bid Opening Notes :Meeting ID: 898 4420 5709 --- One tap mobile +13052241968,,89844205709# US +13092053325,,89844205709# US --- Dial by your location o +1 305 224 1968 US o +1 309 205 3325 US o +1 312 626 6799 US (Chicago) o +1 646 931 3860 US o +1 929 205 6099 US (New York) o +1 301 715 8592 US (Washington DC) o +1 564 217 2000 US o +1 669 444 9171 US o +1 669 900 6833 US (San Jose) o +1 689 278 1000 US o +1 719 359 4580 US o +1 253 205 0468 US o +1 253 215 8782 US (Tacoma) o +1 346 248 7799 US (Houston) o +1 360 209 5623 US o +1 386 347 5053 US o +1 507 473 4847 US Meeting ID: 898 4420 5709.

GC Bidding

Water / Sewer

$1,100,000.00

Public - City

Renovation, Site Work

37

19

2

3

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Construction Facilities, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Temporary Roads, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation, Chemical Decontamination, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Steel Decking, Metal Fabrications, Metal Gratings
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Cementitious and Reactive Waterproofing, Crystalline Waterproofing, Joint Protection
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Central Heating Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Enclosed Switches and Circuit Breakers, Lighting, Exterior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Communications Utilities, Communications Distribution
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
66
Bidding Soon
870
All Active Projects
407
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2025

June 17, 2025

img_map_placeholder

2000 River Rd W, Battle Creek, MI

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

WWTP I&E Building and Headworks Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.