BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 20, 2025 at 8:00 PM

Updated May 21, 2025

Site work and new construction of a pre-engineered storage facility in Azle, Texas. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

** **As of , May 20, 2025 the project was awarded to First Construction, LLC, with an awarded amount of $205,276.** As of 4/15/2025, this project has not yet been awarded. A timeline for award was not determined. The Contract Documents consisting of Advertisement of Bids, Information for Bidders, Bid Proposal, Bid Bond, Contract, Performance and Payment Bonds, Maintenance Bond, General Conditions, Notice of Award, Notice to Proceed, Plans, Specifications, and Addenda (if any) may be examined at the following location: JACOB & MARTIN, LLC 1925 Fort Worth Highway, Weatherford, Texas 76086 The Owner reserves the right to waive any informalities and to reject any or all bids. Bids may be held by the Owner for a period not to exceed 60 days from the date of bid opening for the purpose of reviewing the bids and investigating the qualifications of Bidders prior to awarding of the contract. This project includes: installing approximately a 50' x 100' pre-fabricated metal building, foundation, and all incidental appurtenances for a complete project in accordance with the contract documents and plans. Award of the contract will be made as a whole to one Bidder. The Owner reserves the right to award the contract based upon alternates, and/or reduction in bid quantities as stated in the specifications. The party to whom the contract is awarded will be required to execute the Contract and obtain the Performance-Maintenance-Payment Bonds within twenty-one (21) calendar days from the date the Notice of Award is delivered to the Bidder. The Notice of Award shall be accompanied by the necessary Contract and Bond forms. In case of failure of the Bidder to execute the Contract, the Owner may, at its option, consider the Bidder in default, in which case the Bid Bond accompanying the Proposal shall become the property of the Owner. The Owner within twenty-one (21) days of receipt of the fully executed Contract documents, shall return to the Contractor an executed duplicate of the Contract Documents. Should the Owner not return the executed Contract Documents within such period, The Bidder may, by written notice, withdraw his signed Contract. Such notice of withdrawal shall be effective upon receipt of the notice by the Owner. The Notice to Proceed shall be issued following approval of the executed Contract Documents. All applicable laws, ordinances and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the contract throughout. The Engineer is Derek Turner, P.E. with JACOB & MARTIN, LLC., 1925 Fort Worth Highway, Weatherford, Texas 76086.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$205,276.00

Public - City

New Construction, Site Work

10

13

2

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
414
Active Projects
232
Bidding Soon
3,719
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

May 5, 2025

Project location map

To Be Determined, Azle, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.