Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 21, 2025 at 8:00 PM
Updated March 25, 2025
Site work and paving for a civil project in Winnipeg Beach, Manitoba. Completed plans call for site work for a road / highway; for paving for a road / highway; and bridge / tunnel.
The major components of the Work are as follows: (a) Granular Surface Renewal: (i) scarify existing road and shoulder surfaces; (ii) grade existing road and shoulder surfaces; (iii) compaction of the graded roadway and shoulder; and (iv) place new surfacing material and compact; (b) Granular Reconstruction: (i) excavation of roadway and ditch; (ii) removal and disposal of existing culverts; (iii) installation of new culverts; (iv) placement of geotextile grid separation and filtration fabric; (v) placement of sub-base and base course materials; (vi) placement of granular finished surface utilizing grade control equipment; (vii) reconstruct approaches; and (viii) boulevard grading, ditch grading and seeding; (c) Asphalt Pavement Reconstruction: (i) excavation of roadway and ditch; (ii) coordinate with BellMTS to relocate buried lines as required; (iii) removal and disposal of existing culverts; (iv) installation of new culverts; (v) placement of geotextile grid separation and filtration fabric; (vi) placement of sub-base and base course materials; (vii) reconstruct approaches; (viii) placement of asphalt pavement utilizing grade control equipment (average thickness of one hundred ten (110) millimetres (mm)); (ix) boulevard grading, ditch grading and seeding; and (x) reflective crack maintenance for new asphalt. The Contractor shall not commence the Work on the Site before June 8, 2025. The Award Authority may reject all or any part of any Bid, or waive technical requirements or minor informalities or irregularities, if the interests of the City so require. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Question Deadline 03/13/2025 All enquiries shall be directed to the Contract Administrator
Post-Bid
Roads / Highways
$3,000,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 24, 2025
June 8, 2025
Mollard Rd, Winnipeg Beach, MB
Related To This Project
Winnipeg Beach, MB
Bid Date: Apr 17 2025
Winnipeg Beach, MB
Bid Date: Sep 22 2025
Winnipeg Beach, MB
Bid Date: Sep 18 2025
Winnipeg Beach, MB
Bid Date: Feb 21 2025
Winnipeg Beach, MB
Bid Date: Oct 30 2024
Winnipeg Beach, MB
Bid Date: Jul 08 2024
Winnipeg Beach, MB
Bid Date: Jun 13 2024
Winnipeg Beach, MB
Bid Date: May 31 2024
Winnipeg Beach, MB
Bid Date: Apr 11 2024
Winnipeg Beach, MB
Bid Date: Mar 08 2022
Winnipeg Beach, MB
Bid Date: Jul 19 2023
Winnipeg Beach, MB
Bid Date: May 26 2023
Winnipeg Beach, MB
Bid Date: May 18 2023
Winnipeg Beach, MB
--
Winnipeg Beach, MB
Bid Date: Jan 10 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
