BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 11, 2025 at 8:00 PM

Updated August 12, 2025

Renovation of a mixed-use development in Wichita, Kansas. Design plans call for the renovation of a medical facility.

As of August 11, 2025, a design firm has been selected for the project. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: This is an amendment is to answers to questions that were received in reference to RFP 36C25525R0048. Can you please confirm that we can submit PPQ in place of CPARs and that the PPQ doesn't count toward the page count PPQ's are addressed starting on page 8 of the solicitation. Page limits are addressed starting on page 6 of the solicitation. For section D (organizational chart) we are not to show teaming partner consultants Does this mean we shouldn't include teaming partner consultants in any of the SF330 forms Do you only want us to show you exclusively the Prime A&E firm staff and not any teaming partner consultants. This is addressed on page 5 of the solicitation. Is there a page limit or font size requirement. The solicitation addresses the page information. Normal font size for business correspondence is acceptable. Does the A&E firm have to use the attached SF330 fillable pdf, or can we use our own word documents that has been formatted to the SF330 template The AE can use their own 330 documents, but they must comply with the requirements of 330 located at GSA.gov. A 330 that does not comply with the requirements the 330 may be rejected. The previous link in the solicitation is broken and is not to be used. Can you update the requirement for the design and construction projects within the past 5 years be only for the construction Most of our projects that we would like to use have construction completed within 5 years, but the design was completed in 2017, 2018, 2019. Or is it possible to change the construction completion to a 75% complete. We have many projects that are similar, but the construction is in progress vs. 100% complete. The requirements will not be updated. The Method of Contractor Selection has not been determined at this Time.

Design

Medical

$1,000,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
29
Bidding Soon
366
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2026

Project location map

5500 E Kellogg Dr, Wichita, KS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.