Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 8, 2025 at 7:00 PM
Updated March 15, 2025
Site work for a casino in S Coffeyville, Oklahoma. Completed plans call for site work for a casino.
BONDING NOTICE CNE generally requires payment and performance bonds for all construction contracts in excess of $100,000. However, qualified TERO-certified firms are encouraged to bid, regardless of bonding capability Generally, Contractor shall provide all labor, materials, equipment, tools and services required to provide full, professional lawn and landscaping maintenance and installation at Company's Property (the "Work"), Specifically, the Work shall include the following: 1. Base Services. Contractor shall perform the following Work on the Property on a weekly basis at the minimum, and more frequently as required by weather and growing Generally, Contractor shall provide all labor, materials, equipment, tools and services required to provide full, professional lawn and landscaping maintenance and installation at Company's Property (the "Work"), Specifically, the Work shall include the following: 1. Base Services. Contractor shall perform the following Work on the Property on a weekly basis at the minimum, and more frequently as required by weather and growing conditions: A. Turf Maintenance: o Mowing, edging, blowing, and trimming of all turf areas. o Mowing height to be based on the season and what is horticulturally correct for the turf variety. o Mowing frequency shall be as required to maintain a lawn in the manner acceptable to Company's Representative or designee (max height of 3") Zone B. o Never scalp the lawn or remove more than 1/3 of the existing top growth in one mowing during excessive periods of growth or after extended periods of rainfall, the turf is to be lowered in the appropriate manner possibly requiring multiple cuts. o Areas that are unable to be mowed due to being too wet should be weedeated and/or by any other means kept trimmed back to prevent unsightly overgrowth. o Rutting due to wet conditions should be avoided o Any unsightly or visible clippings which remain on the turf are to be promptly removed. o Zone B Weed prevention/fertilization and mowing program to be applied. o Zone A mowing height should be maintained at a max height of 6" (No weed prevention program and/or fertilization required for this area) o South Field to be priced as mowed and/or "brush hogged" per complete mowing, not to be included in in monthly services. Mowing intervals will be determined by onsite management as an "as needed basis". (No weed prevention program and/or fertilization required for this area) B. Shrub, Tree and Plant Maintenance: o All suckers shall be continuously removed. Pruning for general cleanup of trees and shrubs is recommended in the fall/winter season. All pruning cuts are to be made flush ("stubbing" will not be allowed). o Periodically prune trees as needed to protect pedestrians or vehicular traffic (trees in pedestrian areas to be pruned with the canopy at 7' or higher). o All major pruning shall be done with the expressed authorization of Company's Representative or designee and may require Company Security assistance to reduce potential safety risk. o Remove all dead branches and diseased foliage immediately. o Remove insect or disease infected plant materials. o All trimming and pruning shall be performed to acceptable standards, with the correct equipment. Care must be taken not to use "weed eater" type machinery against the trees (Company, in its sole discretion, may require Contractor to replace trees damaged by weed eaters). C. Turf and Bed Applications: o Contractor shall notify Company's Representative before commencing any chemical application program and all chemicals used on the Property must be approved by Company's Representative and must conform to state or federal requirements. Material Safety Data Sheets for all chemicals used by Contractor on the Property shall be provided to Company's Representative. o Contractor shall strictly adhere to all OSHA or other regulatory agency safety laws, chemical manufacturer's directions, and applicable Company policies and procedures in the use, storage and disposal of chemicals at the Property. o Contractor is permitted to use such pesticides and chemicals as found necessary/advantageous. Chemicals shall be applied only by a properly licensed and approved pesticide applicator. Contractor shall provide Company with a current copy of the Oklahoma Agricultural Food and Forestry Division license that identifies the vendor as a certified applicator for the 3A Certified Applicator Category (Turf and Ornamental Outdoor). o Contractor assumes all liability for damage and/or injury for use, storage and disposal of all chemical products or equipment. o Contractor shall take all precautions necessary to eliminate chemical misuse, personal property damage, and/or damage to wildlife. o Contractor shall notify owner in the event of any unusual circumstances regarding plant deterioration, wildlife death (mammal, fowl or fish) or other abnormal occurrences. o All turf, beds and flowering shrubs shall be fed as needed (a minimum of two times and a maximum of three times per season) with a compatible fertilizer. o Flower beds are to be cleaned and kept free of any debris and/or weeds. o All turf shall be treated with a Spring pre-emergent and a Fall pre-emergent weed control. o Turf and beds shall be spot treated for weeds as needed. o Herbicide spray shall be used to prevent growth in paved areas or areas where vegetated growth is not permitted.
Post-Bid
Casino
$50,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 14, 2025
April 14, 2025
1506 US-169, S Coffeyville, OK
Related To This Project
S Coffeyville, OK
Bid Date: May 13 2025
S Coffeyville, OK
Bid Date: Nov 22 2024
S Coffeyville, OK
Bid Date: Sep 06 2024
S Coffeyville, OK
Bid Date: Sep 04 2024
S Coffeyville, OK
Bid Date: Jul 19 2024
S Coffeyville, OK
Bid Date: Feb 20 2024
S Coffeyville, OK
Bid Date: Jun 28 2022
S Coffeyville, OK
Bid Date: Jun 17 2022
S Coffeyville, OK
Bid Date: Apr 06 2022
Park Hill, OK
Bid Date: Mar 10 2025
Choctaw, OK
Bid Date: Mar 17 2025
Tulsa, OK
Bid Date: Mar 21 2025
Tulsa, OK
Bid Date: Mar 28 2025
Claremore, OK
Bid Date: Apr 17 2025
Grove, OK
Bid Date: Mar 31 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
