BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 9, 2025 at 8:00 PM

Updated April 10, 2025

Site work and paving for a road / highway in Greensboro, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work to be done consists of the furnishing of all equipment, labor, and materials for the complete construction of: LMIG: Deep Patching, Chip Seal, Mill Tie-Ins, And Plant Mix Resurfacing of 44.04 miles of County Roads. Includes Striping, Stop Bars, And Traffic Control. SPLOST: Build 3' Shoulders, With Permanent Vegetation. Includes Grading, Hauling, Compacting, Sweeping, Hydro-Seeding, And Traffic Control. All work performed for this project will be in accordance with the Georgia Department of Transportation Standard Specifications, Construction of Transportation Systems, 2001 edition, all addenda issued to the Specifications by the Georgia Department of Transportation and any modifications identified in the bid documents. The Bidder shall be responsible for performing with his own organization at least fifty percent (50%) of the work in this contract. The Bidder shall not subcontract, transfer, assign, or otherwise dispose of the contract or any portion thereof, without the written consent of the County. Bidders must comply with Title VI of the Civil Rights Act of 1964, the Anti-Kickback Act, the Contract Work Hour Standard Act, and the National Occupational Safety and Health Act of 1970. Bidders must certify that they do not and will not maintain or provide for their employees any facilities which are segregated on a basis of race, color, creed, or national origin. Bidders must comply with the Georgia Security and Immigration Compliance Act. The successful bidder shall secure and pay for necessary approvals, permits, assessments, and changes required for construction and installation of this project as required by local, state, and federal regulations. The successful Bidder will be required to post a performance bond in the amount of the Contract. No submitted bid may be withdrawn after the scheduled closing time or receipt of bids for a period of thirty (30) days. The Greene County Board of Commissioners reserves the right to reject all bids and to waive formalities. Any claims for cost incurred for any Bidder in preparation of any part of or total package for this project will not be considered for reimbursement by Greene County. The Bidder is required to submit only the Bid Proposal, which includes: 1. Completed Bid Proposal Form Page 2. Bid Bond or Certified Check 3. Certification of Contractor re: Non-Segregated Facilities 4. Non-collusion Affidavit of Prime Bidder 5. Certifications 6. Completed Schedule of Items...(Sign Each Page) A pre-bid conference for all bidders will not be held. LMIG PROJECT: DEEP PATCHING, CHIP SEAL, MILL TIE-INS, AND PLANT MIX RESURFACING OF 44.04 MILES OF COUNTY ROADS. BEN HAMMOND PLACE, OLD ROCK RD., AND LAKE OCONEE TRAIL WILL BE DEEP PATCHED ONLY. PROJECTS INCLUDE STRIPING, STOP BARS, AND TRAFFIC CONTROL. PROJECT NUMBER: PRL 2025-01 THRU PRL 2025-26 SPLOST PROJECT: BUILD 3' SHOULDERS WITH PERMANENT VEGETATION. PROJECTS INCLUDE GRADING, HAULING, COMPACTING, SWEEPING, HYDROSEEDING, AND TRAFFIC CONTROL. VEGETATION MUST BE ESTABLISHED! THE CONTRACTOR CAN EXCAVATE THE DIRT, FROM OUR BORROW SITE. PROJECT NUMBER: PRL SB2025-27 THRU PRL SB2025-35 PRL 2025-02, 03, 04, 05, 06, 07, 08, 09, 10,11,12,13,14,15,16,17,18,19, 20,21,22,23,24,25,26,27

Post-Bid

Roads / Highways

$200,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
267
Active Projects
160
Bidding Soon
1,942
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2025

April 28, 2025

Project location map

Multiple Locations, Greensboro, GA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.