Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 17, 2025 at 8:00 PM
Updated March 26, 2025
Renovation of a mixed-use development in Oklahoma City, Oklahoma. Completed plans call for the renovation of a educational facility.
Francis Tuttle Technology Center Rockwell Campus Inground Irrigation System Upgrade Final Questions Due No Later Than 12 Noon, Tuesday, March 11th, 2025 A Cashiers Check, Certified Check, or Surety Bond in the Amount of (5%) of the Bid Shall Accompany the Submitted Proposal of Each Bidder. The Construction Manager at Risk, T. Scott Construction, Llc, Shall Reserve the Right to Bid Any Package in the Solicitation for Bid. The Owner Reserves the Right to Reject Any of All Bids. The existing system (for the purposes of this document) will be referred to as a he Existing System ; The existing system (for the purposes of this document) will be referred to as a "Multi-Strand wiring - Irrigation System" (also known as a "2-wire - Irrigation System"). The system, at one time, employed the use of; Time-Clock Controllers Decoders (for device identity purposes) Solenoid operated Valves All operated from a Central control location. Most of these devices with the exception of the Solenoid Operated Valves have become defunct and, are abandoned in place. The result is ; The system is currently operated by manually opening and closing of the control valves which, are located throughout the Campus grounds.Demolition : (Refer to the accompanying Plan view drawing for valve box locations) Disconnect all existing wiring currently running from valve box to valve box and/or from any previous clock locations out to, the valve boxes. Clip off the ends of and Bundle abandoned wiring by wrapping its ends W/electrical tape to signify it is abandoned. Disconnect, remove and dispose of any remaining Time Clock Control devices. Disconnect, remove and discard all "Decoders". Disconnect and remove all solenoid actuators (to be replaced W/ new actuators). All existing valves are to remain in place, in their respective valve boxes for reuse.
Post-Bid
Educational
$100,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 25, 2025
April 24, 2025
12777 N Rockwell Ave, Oklahoma City, OK
Related To This Project
Oklahoma City, OK
Bid Date: Apr 02 2025
Oklahoma City, OK
--
Oklahoma City, OK
--
Oklahoma City, OK
Bid Date: May 01 2025
Oklahoma City, OK
Bid Date: Jun 03 2025
Oklahoma City, OK
Bid Date: Apr 01 2025
Oklahoma City, OK
Bid Date: May 29 2025
Oklahoma City, OK
Bid Date: Mar 14 2025
Oklahoma City, OK
Bid Date: Mar 27 2025
Oklahoma City, OK
Bid Date: Mar 25 2025
Oklahoma City, OK
Bid Date: Apr 14 2025
Oklahoma City, OK
--
Oklahoma City, OK
Bid Date: Mar 26 2025
Oklahoma City, OK
--
Oklahoma City, OK
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
