BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 26, 2025 at 8:00 PM

Updated March 27, 2025

Remodeling of an educational facility in Houghton, Michigan. Completed plans call for the remodel of a educational facility.

The project consists of a single contract for the remodel of the dining and servery areas of the Wadsworth Dining Hall. See the drawings and specifications for more details on the scope of work. Please note, this project is a Prevailing Wage Project under the State of Michigan Law Prevailing Wages on State Projects, MCL 408.1101 et seq . The Contractor shall furnish all of the materials and perform all of the Work shown on the Drawings and described in the Specifications, the Wads Dining Hall Remodel Project as prepared by MTU and Nvironment Architecture LLC. Pre-Qualification: Yes Site Directions: Michigan Technological University Campus Wadsworth Dining Hall. Est. Completion Date: Aug. 1, 2025

Bid Results

Educational

$1,614,213.00

Public - State/Provincial

Remodeling

58

19

9

5

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
6
Bidding Soon
73
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2025

April 21, 2025

Project location map

1400 Townsend Dr, Houghton, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.