EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 3, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Bloomington, Indiana. Completed plans call for site work for a water / sewer project.

This project shall include, but is not limited to Cured-In-Place-Pipe lining (CIPP) approximately 18,640 LF of 8" sanitary sewer and approximately 485 LF of 10" sanitary sewer. Also included as Alternative No. 1, are the rehabilitations of approximately 12 manholes along with all other related work and appurtenances necessary to complete the work shown on the Drawings and described in the Specifications ("Project"). Bid Security: Acceptable Bidder's bond or certified check drawn on an acceptable bank in an amount of not less than 5% of the total bid price; For bids of $100,000.00 or more, the successful Bidder shall furnish performance and payment bonds for one hundred percent (100%) of the contract amount prior to the execution of the contract, and said bonds shall remain in effect for a period of one (1) year after final acceptance of the work Contractors must be pre-qualified with the Indiana Public Works Certification Board prior to starting work on any local public works project estimated to be over three hundred thousand Dollars. The Utility Service Board reserves the right to waive any informality and to accept or reject any or all bids submitted. Bids may be held by the Utility Service Board for a period not-to-exceed ninety (90) days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of the Bidders prior to awarding the contract, and awarding the contract. Doc Notes: Bidding Documents shall be shipped via UPS Ground service (digital files will be downloaded through an internet link). Overnight delivery via UPS or FedEx of the Bidding Documents shall only be made using recipient's billing account number. Bids from anyone not on the Issuing Office's Plan Holders List will be returned unopened. The Project documents and plans are on file and available for inspection only at the Bloomington Utility Office, 600 East Miller Drive, Bloomington, Indiana, 47401. Complete digital Project documents and plans are available for review and download by contacting Caden Swanson at caden.swanson@bloomington.in.gov. With your request; please include your contact information including representative's name, company, email address, and phone number. Hard copies of Project documents and plans will not be provided.

Award

Water / Sewer

$774,750.00

Public - City

Site Work

7

15

2

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Plugging, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
57
Bidding Soon
907
All Active Projects
410
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2025

April 23, 2025

img_map_placeholder

Multiple Locations, Bloomington, IN

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Pigeon Hill Sewer Lining Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.