BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 31, 2025 at 8:00 PM

Updated November 1, 2025

Site work and paving for a mixed-use development in Niagara Falls, New York. Conceptual plans call for site work for a transportation facility; water / sewer project; and for paving for a transportation facility.

As of October 31, 2025, a firm has been selected for this solicitation. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: The Niagara Frontier Transportation Authority (NFTA) owner and operator of the Niagara Falls International Airport (NFIA), invites interested Consultants to submit a technical proposal that have the requisite, demonstrable competence and experience in architectural and engineering services for the design, construction monitoring, and design support services during construction for the planned taxiway rehabilitation / extension entitled "NFIA - Taxiway D Realignment & Extension". Qualified firms both singly or in teams must have the requisite, demonstrated competence and experience in and a thorough knowledge of the required architectural and engineering services required for the Project. Estimate $850,000.00 Qualified firms must demonstrate service competency expertise in project design, agency coordination, procurement, construction administration, and commissioning. The project work requires full civil aviation runway and taxiway reconstruction engineering services including civil site plan development, soils/foundation engineering, utility design and coordination (power, storm sewer, communications, internet) and electrical (power distribution, communications including video surveillance). The goal of this project is to extend / realign Taxiway D with the planned extension of Runway 10-28 at the Niagara Falls International Airport's (NFIA). The project will also include pavement removal, a realignment of Taxiway D to runway 6-24, and wetland / storm water mitigation. The time of completion for the project is 225 calendar days after receipt of the Notice to Proceed. Disadvantaged Business Enterprises (DBE) participation is required. The participation goal for this contract is 16.9% DBE The method of Contractor Selection has not been Determined at this time. All question were due via email to jacob.ohearn@nfta.com by 2:00 P.M. on Thursday March 20, 2025. Responses to the questions received are provided below Interview - 4/10/25 (Anticipated) Contract negotiation completion - 5/5/25 (Anticipated) Board award date - 5/29/25 (Anticipated) 7/21/25 NTP for design (Anticipated) 100% Design Submission1/26/26 Receipt of Bids 3/4/26 Contract Award 3/26/26 NTP Construction 6/11/26 Construction Complete 1/7/26

Conceptual

Transportation Terminals

$850,000.00

Public - State/Provincial

Paving, Site Work

3

5

4

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
520
Active Projects
303
Bidding Soon
4,844
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2026

Project location map

2035 Niagara Fls Blvd, Niagara Falls, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.