BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 16, 2025 at 8:00 PM

Updated June 17, 2025

Site work and new construction of a pre-engineered storage facility in Jacksonville Beach, Florida. Working plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Clear Span Building The City shall reserve the right to reject any or all proposals not in the best interest of the City The project is located at the Public Works Facility in the City of Jacksonville Beach and consists of Installation of clear span metal buildings : Contractor shall be responsible for properly unloading,storing, installing and maintaining all materials and equipment. The Contractor shall perform the work complete, in place, and ready for continuous service, and shall include repairs, testing, permits, cleanup, and replacements and restoration required as a result of damages caused during this construction. Installation of clear span metal buildings The Contractor shall furnish all labor, equipment, tools, services and incidentals to complete all Work required by these Specifications and as shown on the Drawings. Contractor shall be responsible for properly unloading, storing, installing and maintaining all materials and equipment. The Contractor shall perform the Work complete, in place, and ready for continuous service, and shall include repairs, testing, permits, cleanup, and replacements and restoration required as a result of damages caused during this construction. This Contract comprises the improvements in the downtown area of Jacksonville Beach, as shown on the Drawings and specified herein. The Work consists of furnishing all labor, equipment and materials for the construction, demolition and abandonment efforts. The general summary of work is as listed below. o Provide construction documents for a Clear Span Metal Building with dimensions of 110' Long x 75' Wide x 18' Tall in the location shown in the attached map. o Proposed building: Open on short ends and install 2-20'x14' openings on long ends. o Provide and install clear span building per Engineer and manufacturer specifications. (Roof Panel - PBR 26g; Wall Panel - PBR 26g). o Provide and install Engineered plans for footings/foundation for the building. o Saw cut and remove portion of existing concrete curb where proposed precast concrete foundation or proposed building are proposed. o Remove and relocated existing light pole. o Site restoration including sod, and restoration of any structures, equipment, systems, or areas of the site disturbed by construction to its preconstruction condition. B. The Contractor shall furnish all labor, equipment, tools, services and incidentals to complete all Work required by these Specifications and as shown on the Drawings. Contractor shall be responsible for properly unloading,storing, installing and maintaining all materials and equipment. C. The Contractor shall perform the Work complete, in place, and ready for continuous service, and shall include repairs, testing, permits, cleanup, replacements and restoration required as a result of damages caused during this construction. D. All materials, equipment, skills, tools and labor which are reasonably and properly inferable and necessary for the proper completion of the Work in a substantial manner and in compliance with the requirements stated or implied by these Specifications or Drawings shall be furnished and installed by the Contractor without additional compensation, whether specifically indicated in the Contract Documents or not. E. The Contractor shall comply with all Municipal, County, State, Federal, and other codes which are applicable to this Project.

Final Planning

Warehouse / Distribution - Pre-Engineered Storage Building

$200,000.00

Public - City

New Construction, Site Work

5

4

10

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
60
Bidding Soon
1,132
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2025

June 17, 2025

Project location map

To Be Determined, Jacksonville Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.